29
CHECK AND ADJUSTMENT PROCEDURES
:
Drilling Check and Adjustment
3
3.6.4
Adjusting the hole/slot reference, drill zero point, and drill hole vertical position
■
Adjust the hole/slot reference, drill zero point, and hole vertical position in the following procedure
when these are outside the setting range after the drilling confirmation shape is checked.
1
Display the menu screen in service mode.
See “3.2.1 Entering service mode” (page 16).
2
Press the Grinding tab on the menu
screen.
The Grinding screen is displayed.
1) Press the Adjustment button.
2) Press the Hole button.
z
Adjusting the hole/slot reference
When the difference between A and B is
0.1 mm or more, press the "Hole/slot ref-
erence" numeric field.
Change the parameter value with the
numeric keypad. Enter the value and
press the
button.
•
A < B Increase the adjustment value.
•
A > B Decrease the adjustment value.
2
1)
1)
2)
2)
Содержание ME 1200
Страница 6: ...IV ...
Страница 10: ...2 REQUIREMENTS Requirements ...
Страница 58: ...50 CHECK AND ADJUSTMENT PROCEDURES Clock Check ...