4
INSTALLATION PROCEDURE
:
Unpacking
2.2
Unpacking
Unpack the shipping carton according to the following procedure.
1
Hold the joint levers of the joints (4
units) and turn each of them to the
left.
The shipping carton is unlocked.
* Do not remove or cut the tape.
2
Hold the shipping carton and lift it
up for removal.
3
Remove the accessory case,
upper pad, and upper right and left
packing support in order.
4
Place the main body in the instal-
lation position by two persons or
more.
The weight of the main body is
approximately 52 kg.
See “2.1 Installation Location and
Instrument Main Body Movement”
(page 3).
㸣
㸣
Υ
Υ
㸯
㸣
㸣
Υ
Υ
㸯
3
1
2
4
Pallet base
Tape
Shipping
carton
Joints (4 units)
Shipping
carton
accessory
case
Upper right pack-
ing support
Upper pad
Me 1200
main body
Upper left pack-
ing support
Joint lever
Содержание ME 1200
Страница 6: ...IV ...
Страница 10: ...2 REQUIREMENTS Requirements ...
Страница 58: ...50 CHECK AND ADJUSTMENT PROCEDURES Clock Check ...