3.2 Access to the Volume Area
BP4610
3-6
3.2 Access
to
the
Volume
Area
To access the volumes (T, V, I) beneath the operation panel, lift the operation panel.
POWER
EXT SIGNAL IN
V
O
MONITOR OUT
I
O
O I
1/100
1V/10A
RESPONSE
CAL
T
V
I
Figure 3-1. Lift Operation Panel
When lifting the operation panel, first gently pull the panel toward you holding its top and
bottom.
After pulling out the panel until it stops, gently lift up only the bottom of the panel. The
operation panel will remain lifted at the angle you have chosen.
Note that the keys on the panel must not be operated while the panel is fixed in a lifted position.
How to lift the operation panel
(1) Holding the top and bottom of the operation
panel, gently pull it toward you.
(2) Pull out the operation panel until it stops.
(3) Then lift up only the bottom of the panel.
(4) Once the panel is at the desired angle,
release it.
Figure 3-2. Operation Panel Lifting Method
Do not try to lift the operation panel without first pulling it out, as this will damage the panel.
!
CAUTION
Содержание BP4610
Страница 1: ...NF Corporation BIPOLAR DC POWER SUPPLY BP4610 Instruction Manual nbn Austria GmbH...
Страница 2: ......
Страница 3: ...DA00010493 001 BIPOLAR DC POWER SUPPLY BP4610 Instruction Manual...
Страница 4: ......
Страница 16: ......
Страница 17: ...BP4610 1 OVERVIEW 1 1 General 1 1 1 2 Features 1 1 1 3 Principle of Operation 1 3...
Страница 18: ......
Страница 24: ......
Страница 38: ......
Страница 40: ......
Страница 48: ......
Страница 134: ......
Страница 162: ......
Страница 164: ......
Страница 167: ...6 1 Error Messages BP4610 6 3 Figure 6 1 Protective Function Related Error Display Examples...
Страница 174: ......
Страница 190: ......
Страница 207: ...BP4610 9 INITIAL SETTING LIST 9 1 Initial Setting List 9 1...
Страница 208: ......
Страница 212: ......
Страница 214: ......
Страница 216: ......
Страница 217: ......