Issue 4.1
UNIVERGE SV8100
4 - 108
Installing the SV8100 Blades
6.3.2.2
CD-CP00IP Address Assignment
The GSWU Main board will be provided with an IP address
from the back plane CPU during the initialization sequence.
The provision of an IP address from the back plane will
identify the Main board. If during initialization, the IP address
is set to
0
by the CPU, the blade is then determined to be an
Add-on
.
The IP address for the GSWU is assigned in Program 10-55
on the system. It contains the settings for the IP Address,
Subnet Mask and Gateway IP Address.
6.3.2.3
Group Formation
When a GSWU determines that it is an
Add-on
board due to
the lack of an IP address from the backplane, it sends a
broadcast P2P message (defined in separate
documentation) to all the GSWU units in the system until it
receives an acknowledge message from the Main board.
The Main board receiving this broadcast message will
acknowledge by sending port identification information to
the Add-on board.
6.3.2.4
Port Number Determination
When a Main board is initialized, the board assigns the first
eight ports as port 1 ~ 8. When subsequent Add-on boards’
broadcast messages are received, the Main board assigns
port numbers on a first come, first serve basis.
.
To have deterministic port assignment, it is recommended the
the Add-on boards be inserted sequentially starting with the
desired lower port numbers first.
When a board is removed, the port numbers are not
automatically removed. The operator, however, can remove
any assignment by accessing the Main board GUI.
Example:
Main board is inserted in slot 3, one Add-on board inserted
in slot 5. Main board has ports 1 ~ 8; Add-on board has ports
9 ~ 16.
1. User inserts a new Add-on board in slot 2.
The new board gets assigned ports 17 ~ 24.
Содержание Univerge SV8100
Страница 1: ...System Hardware Manual Issue 4 1 February 2011...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Страница 40: ...Issue 4 1 UNIVERGE SV8100 2 4 SV8100 System Specifications Figure 2 1 SV8100 System Block Diagram...
Страница 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Страница 75: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 7 Figure 3 7 Install Wall Mount Brackets with Screws...
Страница 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Страница 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Страница 191: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 43 Figure 4 15 Connecting a IPLA Daughter Board to a Network PC...
Страница 207: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 59 Figure 4 22 Installing the PZ 8LCE Daughter Board...
Страница 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Страница 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Страница 335: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 5 77 Figure 5 92 Bluetooth Handset Controls and Indicators...
Страница 354: ...Issue 4 1 UNIVERGE SV8100 5 96 Installing DT300 DT700 Series DTL ITL Digital and IP Multiline Terminals...
Страница 360: ...Issue 4 1 UNIVERGE SV8100 6 6 Installing SV8100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 367: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 368: ...Issue 4 1 UNIVERGE SV8100 6 14 Installing SV8100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 380: ...Issue 4 1 UNIVERGE SV8100 6 26 Installing SV8100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 417: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on CD 4COTA Blade...
Страница 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...
Страница 419: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...