UNIVERGE SV8100
Issue 4.1
System Hardware Manual
4 - 23
RUN (LED 1) = The CPU is operating (green)
LED 2, and 3 = Alarms (red)
LED 4 = Flash access indication (red)
LED 5 = The USB memory connection status (red)
(LED off when no USB memory installed)
Refer to Program 90-10: System Alarm Setup for details on assigning
alarm LEDs.
Table 4-7 CD-CP00 LED Indications on page 4-23
provides a list of
each LED and associated operation and status indications. Refer to
Figure 4-3 CD-CP00 Blade Layout on page 4-16
for the location of
the LEDs on the CD-CP00.
Table 4-7 CD-CP00 LED Indications
LED Indication
Status
RUN (LED1)
LED2
LED3
LED4
LED5
Blinking
Off
Off
Off
On Steady When
USB Memory is
Installing
System operating normally
Off
Off
Off
Off
Blinking
Boot is starting
Off
On
Off
Off
Off
Initializing the disk or
formatting
Blinking
Blinking
Off
Access
Blink
On Steady When
USB Memory is
Installing
Boot program is initializing in
the flash memory
Off
On
On
Access
Blink
On Steady When
USB Memory is
Installing
Reading system software
Off
On
Off
Access
Blink
On Steady When
USB Memory is
Installing
Upgrading system software
On
Blinking Blinking Blinking On Steady When
USB Memory is
Installing
Finish formatting (SRAM,
Flash)
Blinking
Off
Off
Off
Off
DRAM error
Blinking
Off
Off
On
On Steady When
USB Memory is
Installing
FPGA version error
Blinking
Off
On
Off
On Steady When
USB Memory is
Installing
SRAM error
Содержание Univerge SV8100
Страница 1: ...System Hardware Manual Issue 4 1 February 2011...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Страница 40: ...Issue 4 1 UNIVERGE SV8100 2 4 SV8100 System Specifications Figure 2 1 SV8100 System Block Diagram...
Страница 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Страница 75: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 7 Figure 3 7 Install Wall Mount Brackets with Screws...
Страница 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Страница 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Страница 191: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 43 Figure 4 15 Connecting a IPLA Daughter Board to a Network PC...
Страница 207: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 59 Figure 4 22 Installing the PZ 8LCE Daughter Board...
Страница 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Страница 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Страница 335: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 5 77 Figure 5 92 Bluetooth Handset Controls and Indicators...
Страница 354: ...Issue 4 1 UNIVERGE SV8100 5 96 Installing DT300 DT700 Series DTL ITL Digital and IP Multiline Terminals...
Страница 360: ...Issue 4 1 UNIVERGE SV8100 6 6 Installing SV8100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 367: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 368: ...Issue 4 1 UNIVERGE SV8100 6 14 Installing SV8100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 380: ...Issue 4 1 UNIVERGE SV8100 6 26 Installing SV8100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 417: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on CD 4COTA Blade...
Страница 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...
Страница 419: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...