UNIVERGE SV8100
Issue 4.1
System Hardware Manual
4 - 37
3.4.4
LED Indications
LED indications for the PZ-32IPLA, PZ-64IPLA and PZ-128IPLA
Daughter Boards are indicated in
Table 4-17 IPLB Daughter Board
LED Indications
. Each LED is listed with its associated function and
LED and Operational status. Refer to
Figure 4-4 CD-CP00 Blade
with Daughter Boards Installed on page 4-17
for the location of the
LEDs on the blades.
The following table shows the LED indication when transmitting or
receiving data on CN1.
Table 4-15 IPLA Daughter Board LED Indications
LED
Function
LED Status
Operation Status
Link 10/100
(LED 1)
10Base-T/100Base-TX link
speed indicator
On Red
100Base-TX link up
LINK 1000
(LED2)
1000Base-T link speed
indicator
On Red
1000Base-T link up
DUPLEX
(LED3)
Duplex Status
On Yellow
Full duplex operation
ACT
(LED4)
Link activity or data
transmission and reception
On Green
Link up completed
Table 4-16 VOIPDB LED CN1 Transmit/Receive Data Indications
LED
Link Up
Auto Negotiation Mode
Force Mode
1000
M bps
100Mbps
10Mbps
1000
M bps
100Mbps
10Mbps
Half
Full
Half
Full
Half
Full
Half
Full
ACT (LED4)
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
DUPLEX (LED3)
ON
OFF
ON
OFF
ON
ON
OFF
ON
OFF
ON
LINK1000 (LED2)
ON
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
LINK10_100
(LED1)
OFF
ON
ON
OFF
OFF
OFF
ON
ON
ON
ON
Содержание Univerge SV8100
Страница 1: ...System Hardware Manual Issue 4 1 February 2011...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Страница 40: ...Issue 4 1 UNIVERGE SV8100 2 4 SV8100 System Specifications Figure 2 1 SV8100 System Block Diagram...
Страница 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Страница 75: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 7 Figure 3 7 Install Wall Mount Brackets with Screws...
Страница 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Страница 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Страница 191: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 43 Figure 4 15 Connecting a IPLA Daughter Board to a Network PC...
Страница 207: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 59 Figure 4 22 Installing the PZ 8LCE Daughter Board...
Страница 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Страница 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Страница 335: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 5 77 Figure 5 92 Bluetooth Handset Controls and Indicators...
Страница 354: ...Issue 4 1 UNIVERGE SV8100 5 96 Installing DT300 DT700 Series DTL ITL Digital and IP Multiline Terminals...
Страница 360: ...Issue 4 1 UNIVERGE SV8100 6 6 Installing SV8100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 367: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 368: ...Issue 4 1 UNIVERGE SV8100 6 14 Installing SV8100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 380: ...Issue 4 1 UNIVERGE SV8100 6 26 Installing SV8100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 417: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on CD 4COTA Blade...
Страница 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...
Страница 419: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...