UNIVERGE SV8100
Issue 4.1
System Hardware Manual
4 - 77
3.
Connect the cable from the NT1 Network Termination cable to
the CN7 or CN8 connector on the CD-2BRIA blade and/or
PZ-2BRIA daughter board. (Refer to
Figure 4-26 CD-2BRIA
Blade on page 4-75
for the location of the connectors on the
blade.)
5.3.3
LED Indications
LED indications for the CD-2BRIA are listed in
Table 4-39 CD-2BRIA
LED Indications
. Each LED is listed with its associated function and
LED and Operational status. Refer to
Figure 4-26 CD-2BRIA Blade
on page 4-75
for the location of the LEDs on the blade.
With normal operation, the status LED
flashes fast. If trouble was found during
the self diagnostics routine, the status LED
flashes slow.
Once connected, the PKG LED will not be
indicated for the status of Layer 1 Link
.
Table 4-39 CD-2BRIA LED Indications
LED Indication
Operation Status
Remarks
Live LED
(Green)
Busy LED
(Red)
On
On
System Initializing
–
Flash (1s)
On
The assignment of the unit is refused.
When you exceed the system
capacity.
When the main software
version is not matched.
Flash (1s)
Trouble found during self-diagnostics.
–
Flash
(100ms)
On
Normal
Operation
A Channel is busy (use
another from CH1 ~ CHx).
–
Off
All channels are idle.
–
Off
On
Unit Busy
A Channel is busy (use
another from CH1 ~ CHx).
–
Off
All channels are idle.
–
Flash 80ms
(On/Off) x 3/
400mS off
Downloading firmware.
–
Содержание Univerge SV8100
Страница 1: ...System Hardware Manual Issue 4 1 February 2011...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...Issue 4 1 UNIVERGE SV8100 1 14 Introduction to SV8100...
Страница 40: ...Issue 4 1 UNIVERGE SV8100 2 4 SV8100 System Specifications Figure 2 1 SV8100 System Block Diagram...
Страница 68: ...Issue 4 1 UNIVERGE SV8100 2 32 SV8100 System Specifications...
Страница 75: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 7 Figure 3 7 Install Wall Mount Brackets with Screws...
Страница 99: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 3 31 Figure 3 34 Install Screws Option 2...
Страница 148: ...Issue 4 1 UNIVERGE SV8100 3 80 Installing the SV8100 Chassis...
Страница 191: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 43 Figure 4 15 Connecting a IPLA Daughter Board to a Network PC...
Страница 207: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 59 Figure 4 22 Installing the PZ 8LCE Daughter Board...
Страница 247: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 4 99 Figure 4 34 Control Signal Connection...
Страница 258: ...Issue 4 1 UNIVERGE SV8100 4 110 Installing the SV8100 Blades NOTES...
Страница 335: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 5 77 Figure 5 92 Bluetooth Handset Controls and Indicators...
Страница 354: ...Issue 4 1 UNIVERGE SV8100 5 96 Installing DT300 DT700 Series DTL ITL Digital and IP Multiline Terminals...
Страница 360: ...Issue 4 1 UNIVERGE SV8100 6 6 Installing SV8100 Optional Equipment Figure 6 5 PGD 2 U10 ADP Connection Diagram...
Страница 367: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 13 Figure 6 11 Setting the PGD 2 U10 ADP for a Door Box...
Страница 368: ...Issue 4 1 UNIVERGE SV8100 6 14 Installing SV8100 Optional Equipment Figure 6 12 Installing a Door Box...
Страница 380: ...Issue 4 1 UNIVERGE SV8100 6 26 Installing SV8100 Optional Equipment Figure 6 17 PGD 2 U10 ADP Connections...
Страница 417: ...UNIVERGE SV8100 Issue 4 1 System Hardware Manual 6 63 Figure 6 64 Power Failure Connector CN3 Shown on CD 4COTA Blade...
Страница 418: ...Issue 4 1 UNIVERGE SV8100 6 64 Installing SV8100 Optional Equipment...
Страница 419: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...