![NEC UNIVERGE NEAX 2000 IPS Скачать руководство пользователя страница 433](http://html1.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_system-manual_3962828433.webp)
CHAPTER 5 OPERATION TEST
– 419 –
NWA-008853-001 Rev.3.0
97ch5001.fm
STEP2:
Connect the cable for loopback test.
(1) When using a twisted-pair cable:
This figure shows an example of the cable connection when the DTI/CCT cards are mounted in the
AP05 and AP06 slot of PIM0.
Loopback Test Connection for Twisted-Pair Cable
PIM0
J
P
MDF
DTI/CCT
AP05
RA
RB
TA
TB
17
42
18
43
LTC1
PIM0
J
P
AP06
RA
RB
TA
TB
1
26
2
27
LOOPBACK
LTC2
17
42
18
43
RA
RB
TA
TB
1
26
2
27
DTI/CCT
RA
RB
TA
TB
LOOPBACK TEST
Содержание UNIVERGE NEAX 2000 IPS
Страница 1: ...NWA 008853 001 ISSUE 3 0 CCIS System Manual...
Страница 14: ...vi NWA 008853 001 Rev 3 0 97toc001 fm THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 18: ...4 NWA 008853 001 Rev 3 0 97ch0001 fm THIS PAGE LEFT BLANK INTENTIONALLY...
Страница 364: ...350 NWA 008853 001 Rev 3 0 97ch3005 fm THIS PAGE LEFT BLANK INTENTIONALLY JANUARY 31 2006...