2-2 Setup and Operation
SETUP
Set up the system by making the following connections.
1.
Set the voltage selector switch to 115V (U.S. and Canada) or 230V and plug the
power cord into the system power socket (see Figure 2-1).
NOTE:
The correct AC input voltage must be
properly set. Select the appropriate voltage with
the voltage selector switch located at the rear of
the system.
Figure 2-1 Voltage Selector Switch
Содержание PowerMate Enterprise
Страница 76: ...Section 2 Setup and Operation igure 2 2Figure 2 3 Figure 2 4 Figure 2 5 Figure 2 6 Figure 2 7 Figure 2 8 ...
Страница 196: ...Section 5 Repair Figure 5 1Figure 5 2Figure 5 3Figure 5 4Figure 5 5Figure 5 6Figure 5 7 ...
Страница 199: ...5 12 Repair 4 Slide the device out of the front of the system unit Figure 5 10 Removing a 5 1 4 Inch Device ...
Страница 271: ...Index 9 W Wake on LAN connector A 14 enabling 2 25 Z Zip drive 1 29 jumper settings B 7 specifications 1 51 ...