CHAPTER 2 INSTALLATION
Floor Standing Installation
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 1.0
Page 71
• Installation of MOUNTING BRACKET
Install the MOUNTING BRACKET to the top-stack PIM if the equipment is stacked with four
or more PIMs.
(1) Remove four screws located on the rear side of the top-stack PIM.
(2) Secure the MOUNTING BRACKET to the PIM with the removed screws.
(3) Secure the PIM to the wall or ceiling by using wires, chains and eyebolts (locally
provided).
Figure 2-18 Installation of MOUNTING BRACKET
SCREWS
FRONT
PIM
MOUNTING BRACKET
Содержание NEAX 2000IVS2
Страница 1: ...JANUARY 2000 NECAmerica Inc ND 70928 E ISSUE 1 STOCK 151998 Installation Procedure Manual ...
Страница 18: ...NEAX2000 IVS2 Installation Procedure Manual Page x ND 70928 E Issue 1 0 This page is for your notes ...
Страница 232: ...NEAX2000 IVS2 Installation Procedure Manual Page 206 ND 70928 E Issue 1 0 This page is for your notes ...
Страница 416: ...NEAX2000 IVS2 Installation Procedure Manual Page 390 ND 70928 E Issue 1 0 This page is for your notes ...