3-18 Setting Up Your Server
To connect the power cord from the server to an interruptive power supply (UPS), use outlet socket
on the rear of the UPS. Refer to the manual that comes with the UPS for details.
When the power cord from the server to a UPS, change the BIOS setup of the server to link with
power supply from the UPS.
Change a parameter for "AC-LINK" under the Server menu of the BIOS SETUP utility. See Chapter
4 for details.
<Example>
Option slot
Reset button for
overload prevention
Outlet socket
Computer interface port (COM)
Voltage sensitivity setting button
Input connector
(NEMA5-15P)
Connector for TVSS device
Computer interface port (COM)
Содержание N8100-1575F
Страница 16: ...x This page is intentionally left blank...
Страница 19: ...Notes on Using Your Server 1 3 2 5 inch Hard Disk Drive Model Attached to the bottom of the chassis...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank...
Страница 67: ...Setting Up Your Server 3 13 4 To remove the rail assembly pull out the rail toward you while pushing the lever...
Страница 158: ...5 30 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Страница 256: ...8 12 Installing and Using Utilities This page is intentionally left blank...
Страница 268: ...9 12 Maintenance This page is intentionally left blank...
Страница 372: ...C 2 IRQ This page is intentionally left blank...
Страница 374: ...D 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Страница 378: ...E 4 Product Configuration Record Table This page is intentionally left blank...