Installing the Operating System with Express Setup 5-31
4.
Specify "Complete memory dump" and modify [Dump file:] in the [Write debugging
information] group box.
e.g. Write the debug information in D drive write the file name "MEMORY.DMP".
D:\MEMORY.DMP
5.
Click [Settings] on the [Performance] group box.
The [Performance Options] window appears.
6.
Click [Advanced] tab on the [Performance Options] window.
7.
Click [Change] on the [Virtual memory] group box.
8.
Modify [Initial Size] in the [Paging file size for selected drive] box to the value larger than
the value of [Recommended] in the [Total paging file size for all drives], and click [Set].
IMPORTANT:
The above-mentioned paging file size is recommended for
collecting debug information (memory dump). The paging file
with initial size large enough to store the dump file in the boot
drive is required.
Correct debug information might not be able to be collected due to
virtual memory shortage when the paging file is insufficient, so set
an enough size of the paging file with the entire system.
For more information on "Recommended" value, see "About the
System Partition Size" described earlier.
In case the memory is expanded, re-specify the paging file to suit
the new memory size.
9.
Click [OK].
The message to restart the system may appear according to the modified specification. In
such case, follow the message to restart the system.
Содержание N8100-1417F
Страница 16: ...x This page is intentionally left blank...
Страница 36: ...2 8 General Description Rear View 1 2 3 4 5 6 7 8 9 10 11 12 13 1 14 12 14 12 14 13 3 13 2 15...
Страница 108: ...4 40 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information...
Страница 119: ...Configuring Your Server 4 51 Use this menu to define several physical drives PD as a disk group DG...
Страница 143: ...Configuring Your Server 4 75 3 Setting menu for VD 0 is displayed...
Страница 195: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear...
Страница 220: ...7 12 Maintenance This page is intentionally left blank...
Страница 300: ...9 42 Upgrading Your Server Removal Remove the HDD cage in the reverse procedure of the installation...
Страница 316: ...9 58 Upgrading Your Server Removal Remove the 5 25 inch device in the reverse procedure of the installation...
Страница 352: ...9 94 Upgrading Your Server This page is intentionally left blank...
Страница 353: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below...
Страница 360: ...10 8 Internal Cabling Diagrams This page is intentionally left blank...
Страница 362: ...A 2 Specifications This page is intentionally left blank...
Страница 370: ...C 2 IRQ This page is intentionally left blank...
Страница 426: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Страница 430: ...G 4 Product Configuration Record Table This page is intentionally left blank...