8-38 Troubleshooting
FORCED SHUTDOWN
Use this function when an OS command does not shut down the server, the POWER/SLEEP switch
does not turn off the server, or resetting does not work.
Press and hold the POWER/SLEEP switch on the server for at least four seconds. The power is
forcibly turned off. To turn on the power back again, wait approximately 10 seconds after turning
off the power (forced shutdown).
IMPORTANT:
If the remote power-on function is used, cycle the power once to
load the OS, and turn off the power again in the normal way.
If the processor is heated excessively, the circuit for protecting
expensive components is started. If so, the POWER/SLEEP switch
cannot be used to control the power because the system is entered
into the reset status. Pull out the power cord and turn off the power.
After a while, check the operation environment (including the
ambient temperature). Then connect the power cord and turn on the
power. It may be necessary to leave the power-off status in the
period until the processor is cooled sufficiently (about five minutes
in normal).
Press this switch for
at least 4 seconds.
Содержание N8100-1417F
Страница 16: ...x This page is intentionally left blank...
Страница 36: ...2 8 General Description Rear View 1 2 3 4 5 6 7 8 9 10 11 12 13 1 14 12 14 12 14 13 3 13 2 15...
Страница 108: ...4 40 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information...
Страница 119: ...Configuring Your Server 4 51 Use this menu to define several physical drives PD as a disk group DG...
Страница 143: ...Configuring Your Server 4 75 3 Setting menu for VD 0 is displayed...
Страница 195: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear...
Страница 220: ...7 12 Maintenance This page is intentionally left blank...
Страница 300: ...9 42 Upgrading Your Server Removal Remove the HDD cage in the reverse procedure of the installation...
Страница 316: ...9 58 Upgrading Your Server Removal Remove the 5 25 inch device in the reverse procedure of the installation...
Страница 352: ...9 94 Upgrading Your Server This page is intentionally left blank...
Страница 353: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below...
Страница 360: ...10 8 Internal Cabling Diagrams This page is intentionally left blank...
Страница 362: ...A 2 Specifications This page is intentionally left blank...
Страница 370: ...C 2 IRQ This page is intentionally left blank...
Страница 426: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank...
Страница 430: ...G 4 Product Configuration Record Table This page is intentionally left blank...