3-22 Setting Up Your Server
To connect the power cord from the server to an interruptive power supply (UPS), use service
outlets on the rear of the UPS. Refer to the manual that comes with the UPS for details.
When the power cord from the server to a UPS, change the BIOS setup of the server to link with
power supply from the UPS.
Change a parameter for "AC-LINK" under the Server menu of the BIOS SETUP utility. See Chapter
4 for details.
N8142-11B
Option slot
Reset button for
overload prevention
Outlet socket
Computer interface port
Voltage sensitivity setting button
Input connector
(NEMAL5-30P)
Connector for TVSS device
Input breaker
Содержание Express5800/R140a-4
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 152: ...4 54 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information ...
Страница 163: ...Configuring Your Server 4 65 Use this menu to define several physical drives PD as a disk group DG ...
Страница 186: ...4 88 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Страница 194: ...4 96 Configuring Your Server This page is intentionally left blank ...
Страница 238: ...5 44 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 247: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 260: ...6 22 Installing and Using Utilities This page is intentionally left blank ...
Страница 278: ...7 18 Maintenance This page is intentionally left blank ...
Страница 352: ...8 74 Troubleshooting This page is intentionally left blank ...
Страница 414: ...9 62 Upgrading Your Server 6 Remove the CPU protect cover 7 Remove the dummy cover from the socket ...
Страница 430: ...C 4 This page is intentionally left blank ...
Страница 457: ...Installing Windows Server 2008 D 27 4 Activate Windows The Windows activation is complete ...