![background image](http://html.mh-extra.com/html/nec/express5800-180rb-7/express5800-180rb-7_user-manual_251233057.webp)
Setting Up the System 2-23
3.
Power off the peripheral devices.
Note:
If the server power cord is connected to a power
control unit such as an UPS (Uninterruptible Power Supply),
refer to the UPS user's guide for proper power-off
procedures.
Forcing a Power Shutdown
A forced power shutdown can be used when the power on/off switch does not
power off the server or the reset functions do not work.
To perform a forced power shutdown:
Press in on the power on/off switch located on the front panel of the
server for at least 4 seconds to force the server power off.
To power on after a forced shutdown, wait 10 seconds and then power on again.
Содержание Express5800/180Rb-7
Страница 1: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 10: ...viii Contents ...
Страница 58: ...2 24 Setting Up the System ...
Страница 111: ...Upgrading Your System 4 5 OM10702 A B C D A Fan cover screw B Fan cover C Grasp holes D Fan Figure 4 1 Replacing a Fan ...
Страница 146: ...4 40 Upgrading Your System ...
Страница 166: ...5 20 Problem Solving ...
Страница 186: ...10 Glossary ...
Страница 190: ...4 Equipment Log ...
Страница 195: ...xx ...
Страница 196: ... 456 01564 001 ...