Upgrading Your System 4-37
27.
Replace the hold down bracket by aligning the tab and the plastic retaining
pin on the front of the processor retention bracket. Once aligned, push in on
the pin, locking the bracket in place (see Figure 4-26).
OM10691
A
B
A. Retaining
latch
B. Keyed/notched
edge
Figure 4-26. Installing the Cache Coherency Filters
28.
Reinstall the profusion carrier tray by carefully positioning the tray on the
guide rails and slide the tray into the chassis (see Figure 4-21).
!
CAUTION
Be careful not to pinch the cables coming from the
peripheral bay when reinstalling the tray.
29.
Ensure that the midplane and profusion carrier tray connectors are properly
aligned.
30.
Simultaneously rotate the eject/insert levers to mate the tray grand connector
with the midplane grand connector. Ensure that the lower tray guide
engages with the tray support attached to the peripheral bay.
31.
Use the 10 screws you removed earlier to secure the tray to the chassis.
Содержание Express5800/180Rb-7
Страница 1: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 10: ...viii Contents ...
Страница 58: ...2 24 Setting Up the System ...
Страница 111: ...Upgrading Your System 4 5 OM10702 A B C D A Fan cover screw B Fan cover C Grasp holes D Fan Figure 4 1 Replacing a Fan ...
Страница 146: ...4 40 Upgrading Your System ...
Страница 166: ...5 20 Problem Solving ...
Страница 186: ...10 Glossary ...
Страница 190: ...4 Equipment Log ...
Страница 195: ...xx ...
Страница 196: ... 456 01564 001 ...