2-2
Setting Up the System
Overview
This chapter describes how to select a site, unpack the system, make cable
connections, and power on the rack-mount system units. Also, provided are the
instructions for assembling the rack-mount system units.
Selecting a Site
The system operates reliably in a typical office environment.
Choose a site that is:
!
Near grounded, three-pronged power outlets.
Note
:
For the United States and Canada, this means
NEMA 5-15R outlets for 100-120VAC and NEMA 6-15R
outlets for 200-240 VAC. For other international sites, this
means three-pronged power outlets applicable for the
electrical code of the region.
!
WARNING
Be sure the power service connection is through a properly
grounded outlet.
!
Clean, dust-free, and well ventilated. Front and rear ventilating openings
kept free of obstructions. Away from sources of heat, vibration or
physical shock.
!
Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
!
Spacious enough to provide at least five inches (13 centimeters) behind
the system and three inches (eight centimeters) on each side of the system
for proper cooling, airflow, and cable clearance.
!
Easily accessible for system maintenance and installation of system
upgrades.
Содержание Express5800/180Rb-7
Страница 1: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 10: ...viii Contents ...
Страница 58: ...2 24 Setting Up the System ...
Страница 111: ...Upgrading Your System 4 5 OM10702 A B C D A Fan cover screw B Fan cover C Grasp holes D Fan Figure 4 1 Replacing a Fan ...
Страница 146: ...4 40 Upgrading Your System ...
Страница 166: ...5 20 Problem Solving ...
Страница 186: ...10 Glossary ...
Страница 190: ...4 Equipment Log ...
Страница 195: ...xx ...
Страница 196: ... 456 01564 001 ...