![background image](http://html.mh-extra.com/html/nec/express5800-180rb-7/express5800-180rb-7_user-manual_251233145.webp)
Upgrading Your System 4-39
Figure 4-28. Removing the Processor Air Baffle
37.
Install the eight processors/terminators onto the mezzanine boards along
with their holddown brackets. See “Processors: Removing and Installing”
and “Front Side Bus (FSB) Termination Board Assembly” earlier in this
chapter.
38.
Reinstall the front bezel. See “Removing and Installing the Front Bezel”
earlier in this chapter.
Содержание Express5800/180Rb-7
Страница 1: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 10: ...viii Contents ...
Страница 58: ...2 24 Setting Up the System ...
Страница 111: ...Upgrading Your System 4 5 OM10702 A B C D A Fan cover screw B Fan cover C Grasp holes D Fan Figure 4 1 Replacing a Fan ...
Страница 146: ...4 40 Upgrading Your System ...
Страница 166: ...5 20 Problem Solving ...
Страница 186: ...10 Glossary ...
Страница 190: ...4 Equipment Log ...
Страница 195: ...xx ...
Страница 196: ... 456 01564 001 ...