![background image](http://html.mh-extra.com/html/nec/express5800-180rb-7/express5800-180rb-7_user-manual_251233123.webp)
Upgrading Your System 4-17
Installing the Top Cover
1.
Observe the safety precautions, warnings, and cautions at the beginning of
this chapter.
2.
Install the 240 VA protective cover. See Figure 4-9
3.
While facing the back of the server, position the top cover over the chassis
so that the tabs along the edges of the cover align with the slots in the top
edge of the chassis.
4.
Gently lower the cover straight down on top of the server.
5.
Place your hands on opposite sides of the cover, then push the cover forward
to seat it.
6.
Attach the cover to the chassis with the screws you removed earlier, and
tighten them firmly (6.0 inch-pounds).
7.
Connect all external cables and power cords to the server.
Содержание Express5800/180Rb-7
Страница 1: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 2: ...xxx ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Страница 10: ...viii Contents ...
Страница 58: ...2 24 Setting Up the System ...
Страница 111: ...Upgrading Your System 4 5 OM10702 A B C D A Fan cover screw B Fan cover C Grasp holes D Fan Figure 4 1 Replacing a Fan ...
Страница 146: ...4 40 Upgrading Your System ...
Страница 166: ...5 20 Problem Solving ...
Страница 186: ...10 Glossary ...
Страница 190: ...4 Equipment Log ...
Страница 195: ...xx ...
Страница 196: ... 456 01564 001 ...