-
117
-
4.
Pull out the cable from the removed battery (to prevent improper contacts).
5.
Remove the studs attached to the new battery that will be installed in the Server.
There are three studs, each of which is fixed to the battery with screws. Remove the
screws to remove the studs from the battery. (The removed studs and screws are not used
any more.)
Screw holes (Studs are located on the rear.)
Содержание EXPRESS5800/140He
Страница 1: ...Nec coF S e r v i c e G u i d e EXPRESS5800 140He EXPRESS5800 140Rd 4 ...
Страница 2: ...This page is intentionally left blank ...
Страница 4: ...This page is intentionally left blank ...
Страница 38: ... 22 Internal View 140Rd 4 1 Fan bay 2 Hot plug PCI slot 3 Non hot plug PCI slot 4 Power supply cage 1 2 3 4 ...
Страница 39: ... 23 Internal View 140He 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay 1 2 3 4 ...
Страница 41: ... 25 140He same as 140Rd 4 plus the following 3 5 inch disk bay Optional hard disk bays 8 5 25 inch disk bays ...
Страница 73: ... 57 Processor board error lamp Processor VRM error lamps Processor board error lamp REAR FRONT ...
Страница 144: ... 128 8 2 3 Processor and VRM Processor 1 Processor 2 Processor 4 Processor 3 ...
Страница 153: ... 137 voltage drop and the system is restarted This is not an error ...
Страница 161: ... 145 No Error message Action 8 The firmware is erased unsuccessfully ...
Страница 163: ... 147 ...
Страница 181: ... 165 12 3 Block Diagram ...
Страница 182: ... 166 This page is intentionally left blank ...
Страница 183: ... 167 This page is intentionally left blank ...
Страница 184: ... 168 ...