![NEC EXPRESS5800/140He Скачать руководство пользователя страница 121](http://html.mh-extra.com/html/nec/express5800-140he/express5800-140he_service-manual_251225121.webp)
-
105
-
4.10.7
Replacement of SCSI-BP (5HDD/3HDD) on 140Rd-4
Chassis
Notes:
To replace the SCSI-BP, first remove all the HDDs from the Server.
Before the replacement, always back up the RAID configuration information.
After the replacement of the SCSI-BP, insert the HDDs into the original slots without changing the
installation positions.
Before removing the HDDs, note their installation positions and put labels indicating the
installation positions on the HDDs.
Before the SCSI-BP can be replaced, the HDD cage must be removed.
1.
Make sure that the power of the Server is off, and disconnect the AC cables from all the
power units.
2.
Remove all HDDs, CD-ROM module and front panel module from the Server.
Remove any backup devices if installed.
3.
Remove the rear access and front access covers.
4.
For the Server of the 3.5-inch device model (3HDD model), pull out the SCSI and power
cables for 3.5-inch devices from the HDD cage.
5.
Remove the HDD cage fixing screws (2) on the front of the Server.
HDD cage
Содержание EXPRESS5800/140He
Страница 1: ...Nec coF S e r v i c e G u i d e EXPRESS5800 140He EXPRESS5800 140Rd 4 ...
Страница 2: ...This page is intentionally left blank ...
Страница 4: ...This page is intentionally left blank ...
Страница 38: ... 22 Internal View 140Rd 4 1 Fan bay 2 Hot plug PCI slot 3 Non hot plug PCI slot 4 Power supply cage 1 2 3 4 ...
Страница 39: ... 23 Internal View 140He 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay 1 2 3 4 ...
Страница 41: ... 25 140He same as 140Rd 4 plus the following 3 5 inch disk bay Optional hard disk bays 8 5 25 inch disk bays ...
Страница 73: ... 57 Processor board error lamp Processor VRM error lamps Processor board error lamp REAR FRONT ...
Страница 144: ... 128 8 2 3 Processor and VRM Processor 1 Processor 2 Processor 4 Processor 3 ...
Страница 153: ... 137 voltage drop and the system is restarted This is not an error ...
Страница 161: ... 145 No Error message Action 8 The firmware is erased unsuccessfully ...
Страница 163: ... 147 ...
Страница 181: ... 165 12 3 Block Diagram ...
Страница 182: ... 166 This page is intentionally left blank ...
Страница 183: ... 167 This page is intentionally left blank ...
Страница 184: ... 168 ...