-
95
-
5.
Remove the screw (1) fixing the management LAN board on the rear of the Server. Then
remove the management LAN board.
6.
Disconnect the SCSI cables on the I/O Board.
The number of SCSI cables varies depending on the system configuration. Remove all the
SCSI cables connected to the I/O Board.
To remove a SCSI cable, always hold the cable tab.
Management LAN board
fixing screw (×1)
Tab
SCSI cable
Содержание EXPRESS5800/140He
Страница 1: ...Nec coF S e r v i c e G u i d e EXPRESS5800 140He EXPRESS5800 140Rd 4 ...
Страница 2: ...This page is intentionally left blank ...
Страница 4: ...This page is intentionally left blank ...
Страница 38: ... 22 Internal View 140Rd 4 1 Fan bay 2 Hot plug PCI slot 3 Non hot plug PCI slot 4 Power supply cage 1 2 3 4 ...
Страница 39: ... 23 Internal View 140He 1 Power supply cage 2 Non hot plug PCI slot 3 Hot plug PCI slot 4 Fan bay 1 2 3 4 ...
Страница 41: ... 25 140He same as 140Rd 4 plus the following 3 5 inch disk bay Optional hard disk bays 8 5 25 inch disk bays ...
Страница 73: ... 57 Processor board error lamp Processor VRM error lamps Processor board error lamp REAR FRONT ...
Страница 144: ... 128 8 2 3 Processor and VRM Processor 1 Processor 2 Processor 4 Processor 3 ...
Страница 153: ... 137 voltage drop and the system is restarted This is not an error ...
Страница 161: ... 145 No Error message Action 8 The firmware is erased unsuccessfully ...
Страница 163: ... 147 ...
Страница 181: ... 165 12 3 Block Diagram ...
Страница 182: ... 166 This page is intentionally left blank ...
Страница 183: ... 167 This page is intentionally left blank ...
Страница 184: ... 168 ...