![background image](http://html.mh-extra.com/html/nec/express5800-120lj/express5800-120lj_user-manual_251189078.webp)
4-10 Configuring Your Server
Peripheral Configuration
IMPORTANT:
Note that the interrupt and/or base I/O address are not
overlapped with others. If the value set for the interrupt or base I/O
address is used in another resource, the yellow asterisk (*) appears.
Reset any item with the yellow asterisk properly.
Option
Parameter
Description
Your Setting
Serial Port A
Disabled
[Enabled]
Selects whether serial port A is enabled or
disabled.
Base I/O
address
[3F8]
2F8
3E8
2E8
Selects the base I/O address for serial port
A.
Interrupt
IRQ 3
[IRQ 4]
Selects the interrupt for a serial port A.
Serial Port B
Disabled
[Enabled]
Selects whether serial port B is enabled or
disabled.
Base I/O
address
3F8
[2F8]
3E8
2E8
Selects the base I/O address for serial port
B.
Interrupt
[IRQ 3]
IRQ 4
Selects the interrupt for a serial port B.
USB Controller
[Enabled]
Disabled
Selects the USB controller is enabled or
disabled.
USB 2.0 Controller
Disabled
[Enabled]
Selects the USB 2.0 controller is enabled or
disabled.
Parallel ATA
Disabled
[Enabled]
Selects parallel ATA is enabled or disabled.
[ ]: Factory-set
Содержание Express5800/120Lj
Страница 16: ...x This page is intentionally left blank ...
Страница 36: ...2 8 General Description Rear View 1 2 3 4 5 6 7 8 9 10 11 12 13 1 14 12 14 12 14 13 3 13 2 15 ...
Страница 108: ...4 40 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information ...
Страница 119: ...Configuring Your Server 4 51 Use this menu to define several physical drives PD as a disk group DG ...
Страница 143: ...Configuring Your Server 4 75 3 Setting menu for VD 0 is displayed ...
Страница 195: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 220: ...7 12 Maintenance This page is intentionally left blank ...
Страница 300: ...9 42 Upgrading Your Server Removal Remove the HDD cage in the reverse procedure of the installation ...
Страница 316: ...9 58 Upgrading Your Server Removal Remove the 5 25 inch device in the reverse procedure of the installation ...
Страница 352: ...9 94 Upgrading Your Server This page is intentionally left blank ...
Страница 353: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Страница 360: ...10 8 Internal Cabling Diagrams This page is intentionally left blank ...
Страница 362: ...A 2 Specifications This page is intentionally left blank ...
Страница 370: ...C 2 IRQ This page is intentionally left blank ...
Страница 426: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Страница 430: ...G 4 Product Configuration Record Table This page is intentionally left blank ...