Installing and Using Utilities 5-53
Procedure in the ft server utility
Perform the procedure below before replacement of a component.
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs and event log.
3.
Click the [Clear] button in [MTBF Clear] of the target component.
The MTBF clearing result can be confirmed by the LEDs on the target component. The
result of the MTBF clearing operation is registered in the event log.
4.
Start the component.
Sample screen of ft server utility
[PCI Module]
Содержание Express 5800/320Lc
Страница 10: ...iv This page is intentionally left blank...
Страница 20: ...1 6 Precautions for Use PCI CPU Modules PCI Module Label A CPU Module Label A Label A...
Страница 34: ...1 20 Precautions for Use This page is intentionally left blank...
Страница 50: ...2 16 General Description Front View inside Tower model Rack mount model...
Страница 94: ...3 14 Windows Setup and Operation 7 Configure the mirror of the extended volume...
Страница 132: ...3 52 Windows Setup and Operation This page is intentionally left blank...
Страница 256: ...5 80 Installing and Using Utilities This page is intentionally left blank...
Страница 269: ...Chapter 7 Troubleshooting If the product does not work properly see this chapter before deciding that it is a breakdown...
Страница 348: ...8 38 System Upgrade 17 Use cable ties to fasten the extra length of cables Cable ties included with cabinet...
Страница 362: ...8 52 System Upgrade This page is intentionally left blank...