
v
Out of Box Failure (OBF) for Hospitality Products
If you experience an out of box failure (OBF) during installation or staging related to a
missing, wrong, or defective unit or item, contact NCR through any of the following
options, which may differ based on the customer sales channel:
•
Local Office
: Field Services will need to log a new case in GEMS.
•
Direct (L1 Support)
: If the customer is contracted for level 1 support, call +1-800-
792-5642, Option 1, Option 1, then open a new case. The “direct support team”
would then need to escalate the GEMS incident to the appropriate support team.
Standard would go to HWT, Brand would be assigned to Brand.
•
Direct Customer with Corporate Help Desk
: Log a new case on NAYS
•
Resellers
: Reseller will log a new case on NAYS
For assistance with the OBF process, provide the following details:
•
NCR Sales Order Number (Sales Order Number is located on the box)
•
Date of product installation or staging when failure is detected
•
Product Model Number
•
Unit Serial Number
•
NCR Part Number or Model Number of defective, missing, or wrong components
•
Description of failure (please be specific. For example: “display will not power on”)
•
Customer/Requestor’s contact name, phone number and/or e-mail address
•
Address to ship replacement part(s)
Hardware that fails after installation or staging DOES NOT qualify as an Out of
Box failure but would be managed using same process described above.
Содержание SelfServ XK32
Страница 1: ...Installation Guide NCR SelfServ XK32 2247 Kiosk Release 1 0 BCC5 0000 5246 Issue B...
Страница 13: ...Product Overview 1 3 Product Labels...
Страница 14: ...1 4 Product Overview Configurations...
Страница 27: ...Hardware Installation 2 17...
Страница 28: ...2 18 Hardware Installation...
Страница 34: ...2 24 Hardware Installation 4 Mount and secure the Metal Stand Legs on the anchors using four M12 nuts...
Страница 56: ...2 46 Hardware Installation 14 Secure the Indicator Light and Camera cables to the cable clamp on the Top Panel...
Страница 80: ...2 70 Hardware Installation 4 Mount and secure the Metal Stand Legs on the anchors using four M12 nuts...
Страница 135: ...Hardware Installation 2 125 3 Secure the top side of the Signage assembly using an M4 flathead screw on each side...
Страница 141: ...Hardware Installation 2 131 3 Tighten the nuts and make sure that the Wall Bracket is firmly secured to the wall...
Страница 145: ...Hardware Installation 2 135 3 Secure the top side of the Signage assembly using an M4 flathead screw on each side...
Страница 156: ...2 146 Hardware Installation 14 Secure the Indicator Light and Camera cables to the cable clamp on the Top Panel...
Страница 179: ...Hardware Installation 2 169 3 Tighten the bolts and make sure that the Wall Bracket is firmly secured to the wall...
Страница 183: ...Hardware Installation 2 173 3 Secure the top side of the Signage assembly using an M4 flathead screw on each side...
Страница 194: ...2 184 Hardware Installation 14 Secure the Indicator Light and Camera cables to the cable clamp on the Top Panel...
Страница 218: ...2 208 Hardware Installation Single Sided Kiosk with PIN Pad Payment Device...
Страница 222: ...2 212 Hardware Installation Dual Sided Kiosk with PIN Pad Payment Device...
Страница 226: ...2 216 Hardware Installation Dual Sided Kiosk with PIN Pad Payment Device...
Страница 227: ...Hardware Installation 2 217 Port Assignments...
Страница 249: ...Hardware Installation 2 239 5 Close the receipt cover 6 Remove excess paper by tearing it against the Cutter Blade...