GT10/GT30
1.4 Internal Wiring Connections for Ports
10
1.4.3
Power Supply Terminals
Maker
Shape
Model
Applicable wiring
Tightening
torque
Round
1.25–MS3 0.25 mm
2
to 1.65 mm
2
0.5 N m
JST Mfg.
Front–opening 1.25–B3A
JST Mfg.
Co., Ltd.
Round
2–MS3
1.04 mm
2 to
2.63 mm
2
Front–opening 2–N3A
Applicable crimp terminals
– The terminal screws are M3 screws. We recommend using crimp terminals for
wiring to terminals.
Open–tip terminals
Round terminals
The tightening torque for terminal base screws should be
between 0.5 and 0.6 N
.
m, or less. Operating at a higher
force could cause damage.
If crimp terminals are not being used, wire with a diameter
of 0.5 mm
2
to 1.25 mm
2
should be used for power cables.
In keeping with the European EMC Directive (EMC Direc-
tive 89/336/EEC), the GT10 conforms to European Stan-
dards (EN50081–2:1993, EN50082–2:1995). As a condi-
tion of compatible, a ferrite core should be installed when
wiring to the terminal base (Seiwa Electric Mfg. Co., Ltd.
E04RC281613 or equivalent).
Ferrite core
+24 V
0 V
F.E.
6.0 mm
max.
6.0 mm
max.
The GT30 conform to European EMC directives (EMC Di-
rective 89/336/EEC) and meet European EMC standards
(EN50081–2, EN6100–6–2). A ferrite core (E04SR211132
by Seiwa Electric Mfg. Co., Ltd. or an equivalent product)
should be installed when wiring connections to the terminal
base, as shown below, in order to meet these requirements.
(D–type
ground)
Ferrite core
Ferrite core
When installing make sure that the connection and power
cables are not stressed, as this could result in broken con-
nections.
When installing make sure that the connection and power
cables are not stressed, as this could result in broken con-
nections.
Содержание GT10
Страница 9: ...Table of Contents GT10 GT30 viii...
Страница 10: ...ix Part I GT10 GT30 Main Unit...
Страница 23: ...Safety Precautions GT10 GT30 xxii...
Страница 24: ...Chapter 1 Specifications...
Страница 37: ...GT10 GT30 1 5 Dimensions 14...
Страница 38: ...Chapter 2 Installation and Wiring...
Страница 48: ...Chapter 3 Setup...
Страница 63: ...GT10 GT30 3 4 Setting the Basic Communication Area GT30 and PLC 40...
Страница 64: ...Chapter 4 Connecting and Communicating with the PLC...
Страница 84: ...GT10 GT30 4 10 Through Function 61 FP Programmer II on an ongoing basis GT10 GT30 FP Programmer II 25V DC max...
Страница 94: ...Chapter 5 GT10 Configuration Settings...
Страница 115: ...GT10 GT30 5 3 Entering Configuration Settings from the GT10 92...
Страница 116: ...Chapter 6 GT30 Configuration Settings...
Страница 138: ...Chapter 7 How the Various Functions Are Used...
Страница 149: ...GT10 GT30 7 3 GT30 Bit Device Functions 126...
Страница 150: ...Chapter 8 Servicing and Maintenance...
Страница 157: ...GT10 GT30 8 5 Replacing the Backlight GT30 Only 134...
Страница 158: ...Chapter 9 Troubleshooting...
Страница 170: ...147 Matsushita Electric Works Europe AG Part II Screen Creation Tool Terminal GTWIN...
Страница 174: ...Chapter 10 Preparing GTWIN...
Страница 187: ...GT10 GT30 10 4 Procedures for Using GTWIN 164...
Страница 188: ...Appendix A Code Tables...
Страница 191: ...GT10 GT30 A 2 ASCII Code Table 168...