Chapter 8. Setup procedure for EZ-CFDL series
This chapter describes the setup procedure for the EZ-CFDL series.
8.1 Combinations of CFDL controller and EZ series ......................................8-1
8.1.1
Combination patterns........................................................................8-1
8.1.2
(A) “CFDL1-0000” + One Robot........................................................8-2
8.1.3
(B) “CFDL2-0000” + Two robots........................................................8-2
8.1.4
(C) “CFDL4-0000” + Four robots.......................................................8-3
8.1.5
(D) “CFDL4-0020” + Two robots........................................................8-3
8.2 Installation of the CFDL Controller............................................................8-4
8.2.1 Ambient condition ...................................................... .......................8-4
8.2.2
Installation procedure and place .......................................................8-4
8.3 Installation of the Robot (EZ series) .........................................................8-5
8.4 Connection of the robot ................................................... .........................8-6
8.4.1
(A) “CFDL1-0000” + One Robot........................................................8-6
8.4.2
(B) “CFDL2-0000” + Two Robots ......................................................8-6
8.4.3
(C) “CFDL4-0000” + Four robots.......................................................8-7
8.4.4
(D) “CFDL4-0020” + Two robots........................................................8-8
8.4.5
Connections of CNR010 (Option) .....................................................8-9
8.5 Connections of the Teach Pendant................................................. ........8-10
8.6 Connection of the External Devices .......................................................8-11
8.6.1
Connection of the cables.................................................................8-11
8.6.2
How to start up the controller from the external PLC and etc..........8-11
8.7 Connection of the Primary power and the grounding (CFDL).................8-12
8.7.1
Before connecting to the Primary Power.........................................8-12
8.7.2
Processing of the Power cable........................................................8-12
8.7.3
Grounding ....................................................... ................................8-12
8.8 Sequence board UM396 ................................................... .....................8-13
8.8.1
Sequence board UM396 .................................................................8-13
8.8.2
Pin layout of TBEX1 and TBEX2.....................................................8-14
8.8.3
JP1 setting (Selection of the power source for the Emergency Stop
circuit) 8-14
8.8.4
Setting of the SW1 (Robot number)................................................8-15
8.8.5
Mini I/O (8 8 points) ...........................................................8-16
8.8.6
When using CC-Link, DeviceNet etc. (Fieldbus options) ................8-16
8.9 CFDL memory format operation (Initialization) .......................................8-17
8.9.1
How to register the Mechanisms (Robots) to the robot controller ...8-17
8.9.2
Set the installation place (Floor / Ceiling installation) ......................8-18
8.9.3
Register the Unit to the controller....................................................8-19
Содержание EZ-CFDL Series
Страница 2: ......
Страница 8: ...Table of Contents NOTE ...
Страница 10: ...ぺージあわせのため白文字 白文字のため印刷されないなので気にしないでください 削除しないでください ...
Страница 58: ...4 4Interference Territory registration NOTE ...
Страница 59: ......
Страница 68: ...5 4File transfer FTP server NOTE ...
Страница 70: ......
Страница 83: ......