Pre-Energization Checks
42
Commissioning Staff Should Have the Following Tools:
Ground Resistance Tester
Multimeter w/ resistance (Ω) testing
Grounding Verification
It is important that the myPV ClearSky be properly grounded to prevent any transient
voltages from not having a safe path to ground.
Due to the myPV ClearSky’s location on an equipment pad and grounding ring, Solar-
Ops recommends the maximum ohmic resistance between the device grounding rod
and the associated ground will be < 2Ω.
Both the Utility Side and Solar Side grounds should be verified.
Содержание ClearSky
Страница 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Страница 12: ...Resources 12 ...
Страница 14: ...Resources 14 ...
Страница 19: ...Resources 19 ...
Страница 20: ...Resources 20 ...
Страница 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Страница 55: ...Initial Energization 55 ...
Страница 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Страница 64: ...Operational Testing 64 Numbered Illustration of Mode Selection Switch Protective Relay Indicators ...
Страница 68: ...Spare Parts 68 ...
Страница 69: ...Spare Parts 69 ...