Receiving
31
Setting & Orientation
The myPV ClearSky should always be set on level, flat, and solid foundation that is
properly designed to support its weight and size.
The myPV ClearSky has two electrical termination cabinets that are specific to the
“Utility Side” and “Solar Side” medium voltage (MV) conduit locations.
The myPV ClearSky MUST BE ORIENTED APPROPRIATELY so the at the appropriate
electrical termination cabinet is location above the appropriate conduit.
Содержание ClearSky
Страница 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Страница 12: ...Resources 12 ...
Страница 14: ...Resources 14 ...
Страница 19: ...Resources 19 ...
Страница 20: ...Resources 20 ...
Страница 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Страница 55: ...Initial Energization 55 ...
Страница 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Страница 64: ...Operational Testing 64 Numbered Illustration of Mode Selection Switch Protective Relay Indicators ...
Страница 68: ...Spare Parts 68 ...
Страница 69: ...Spare Parts 69 ...