Design Considerations
21
Design Considerations
Failing to plan is planning to fail. Although the myPV ClearSky™ Interconnection is very
simple to design for and incorporate into your project design, there are aspects of the
equipment that should be considered in the initial design to avoid unnecessary costs
and difficulties during construction.
Installation Location
The myPV ClearSky’s low profile and compact design provides Developers and
Engineers and unprecedented level of flexibility regarding installation location. While
many Customers choose to incorporate the padmount gear into the equipment pad
closest to the point of interconnection, others choose to locate the myPV ClearSky at
the Point of Interconnection (POI).
If you have concerns about the location of the myPV ClearSky’s metering and the POI,
we recommend one of the following 2 approaches:
Содержание ClearSky
Страница 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Страница 12: ...Resources 12 ...
Страница 14: ...Resources 14 ...
Страница 19: ...Resources 19 ...
Страница 20: ...Resources 20 ...
Страница 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Страница 55: ...Initial Energization 55 ...
Страница 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Страница 64: ...Operational Testing 64 Numbered Illustration of Mode Selection Switch Protective Relay Indicators ...
Страница 68: ...Spare Parts 68 ...
Страница 69: ...Spare Parts 69 ...