Commercial Operation
66
Inspection
Description
Every
(Yrs)
Outage
Following isolation and LOTO, the Utility side MV Termination
cabinet should be opened to: 1. Inspect that it is free of debris,
water, animals, or other contamination 2. MV elbows are firmly
seated 3. MV conductors are fee of defects 4. All grounds and
bleed wires are intact 5. Electrical conduits are sealed 1. If
contamination is observed, the cabinet should be cleaned.If
unseated, MV elbows should be removed, new silicon applied,
and re-seated. If damaged, MV conductors should be
services/replaced by a qualified party. If poor/un-grounded,
grounds should be repaired and tested. If unsealed, conduits
should be re-sealed.
2
Following isolation and LOTO, the Solar side MV Termination
cabinet should be opened to: 1. Inspect that it is free of debris,
water, animals, or other contamination 2. MV elbows are firmly
seated 3. MV conductors are free of defects 4. All grounds and
bleed wires are intact 5. Electrical conduits are sealed 1. If
contamination is observed, the cabinet should be cleaned.If
unseated, MV elbows should be removed, new silicon applied,
and re-seated.If damaged, MV conductors should be
services/replaced by a qualified party. If poor/un-grounded,
grounds should be repaired and tested. If unsealed, conduits
should be re-sealed.
2
Содержание ClearSky
Страница 1: ...myPV ClearSky User Manual 1 myPV ClearSky User Manual ...
Страница 12: ...Resources 12 ...
Страница 14: ...Resources 14 ...
Страница 19: ...Resources 19 ...
Страница 20: ...Resources 20 ...
Страница 48: ...Pre Energization Checks 48 Control Panel Verification Locations ...
Страница 55: ...Initial Energization 55 ...
Страница 63: ...Operational Testing 63 The myPV ClearSky may be left in this condition indefinitely ...
Страница 64: ...Operational Testing 64 Numbered Illustration of Mode Selection Switch Protective Relay Indicators ...
Страница 68: ...Spare Parts 68 ...
Страница 69: ...Spare Parts 69 ...