![MTI Matrix System 1210 Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/mti/matrix-system-1210/matrix-system-1210_manual_1852322060.webp)
Installation
60
2. Checking Your Space
Make sure you have plenty of space inside your display for the installation of all the Switching Modules and
cables. Now that you can see all the parts, check the surfaces you are planning to attach the Modules to and
adjust your layout accordingly. It is important to install Switching Modules and MVP Control Panel Modules
in such a way that you can reasonably access them for upgrading and modification after the installation is
complete.
3. Tools and Supplies Needed
•
An assortment of Phillips screwdrivers and a small flat-blade screwdriver.
•
Wire and cables necessary to complete all the interconnections in your System. These
items may be ordered from MTi.
•
Wire connection tools – strippers, crimpers, and cutters.
•
Heat-shrink tubing to cover spliced wires.
•
A cordless, reversible, power screwdriver, such as a
Makita
(optional).
•
A soldering iron (optional for some wire-end and power connectors).
•
An indelible felt pen for labeling connection points, numbering switching Modules, etc. for
reference purposes.
•
A volt/ohm meter.
•
Plastic tie wraps, eye ties and screws for securing wire bundles.
•
Labels for cable ends. (MTi sells sheets of adhesive numbers for this purpose – talk to our
Sales or Customer Service department.)
•
A telephone (preferably cordless) – we encourage you to call our Customer Service
department with any questions that arise during the installation process or at any time that
we can help you with the use of your MTi Switching and Display System –
1-800-426-6844
.
Содержание Matrix System 1210
Страница 1: ...Matrix Systems 063 0145 00 Rev B 08 02 ...
Страница 8: ...Introduction 8 ...
Страница 16: ...Introduction 16 ...
Страница 84: ...Installation 84 ...
Страница 88: ...Diagrams 88 ...
Страница 106: ...Introduction 106 ...