46
Operation
ALTAIR io360
US
(6) Power off the HUB.
(7) Close housing lid by tightening the lid screws with a torque of
13 in-lb +/- 1 in-lb (1.5 Nm. +/- 0.1 Nm).
(8) Close joint.
(9) Install grounding Clamp.
a) Remove grounding clamp.
b) Insert grounding cable and re-tighten grounding clamp with a
torque of 17 in-lb +/- 1 in-lb (2 Nm +/- 0.1 Nm).
(10) Mount HUB to its final location. Use four screws to fasten the wall
brackets to the surface and apply a torque of 45 in-lb +/- 5 in-lb
(5 Nm +/- 1 Nm).
NOTE:
It is the customer's responsibility to ensure the mounting system is
properly chosen and installed such that it is capable of supporting 20
pounds of weight. Ensure the connectors and wires are supported to
remove the stress and strain on the HUB.
(11) Power the HUB following the steps in section “Powering the HUB“