5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
62
5293079/01 EN
VACUTAP
®
VM-Ex
2. Take suitable measures to ensure the screw connection cannot come
loose or settle (e.g. by using clamping washers).
Figure 44: Take-off lead connection on oil compartment
5.3.3.7.2 Take-off lead connection on take-off ring
1. Connect the on-load tap-changer take-off lead to 1 of the 3 through-holes
on the take-off ring using a cable shoe and screw. The cable shoe and
fastening materials are not included in the scope of delivery.
2. Pay attention to the screw length. A minimum distance of 2 mm must be
maintained between screw and oil compartment.
Figure 45: Connecting ring of oil compartment
3. Take suitable measures to ensure the screw connection cannot come
loose or settle (e.g. by using clamping washers).