6.3 Commissioning transformer at operating site
Before energizing the transformer, check that the motor-drive unit and pro-
tective devices are functioning correctly and fill the on-load tap-changer oil
compartment with fresh insulating fluid.
6.3.1 Filling the oil compartment of the on-load tap-changer with
insulating fluid
NOTICE
Damage to the on-load tap-changer!
Unsuitable insulating fluids cause damage to the on-load tap-changer.
► Use insulating fluids that meet the requirements in accordance with IEC
60296.
► If approved by the transformer manufacturer, you can use synthetic es-
ters in accordance with IEC 61099 or natural esters in accordance with
IEC 62770 approved by Maschinenfabrik Reinhausen GmbH.
1. Establish a connecting lead between pipe connection E2 and one of the
pipe connections R, S or Q to ensure equal pressure in the oil compart-
ment and transformer during evacuation.
Figure 212: Connecting lead between E2 and Q