TDY
24
Demand Moore Reliability
Installing and
Connecting the TDY
Now that the TDY has been programmed to your
satisfaction, it is ready for installation.
The TDY is available only in the HP housing style,
but may be enclosed in any one of several types of
certified or uncertified connection heads. Consult your
local Moore Industries’ Interface Solutions Expert for
information on the type of enclosure that best suits
your application.
Connecting the TDY in an Application
Moore Industries suggests installing the TDY by first
mounting the unit in its intended application, then
making the electrical connections to input, output,
and power. Before any installation, make sure that
the unit has been bench checked to ensure that it is
configured and calibrated properly for its intended
application.
Recommended Ground Wiring
Practices
Moore Industries recommends the following
ground wiring practices:
• Any Moore Industries product in a metal case or
housing should be grounded.
• The protective earth conductor must be connected
to a system safety earth ground before making other
connections.
• All input signals to, and output signals from, Moore
Industries’ products should be wired using a shielded,
twisted pair wiring technique. Shields should be
connected to an earth or safety ground.
• For the best shielding, the shield should be run all the
way from the signal source to the receiving device.
(see Note below)
• The maximum length of unshielded input and output
signal wiring should be 2 inches.
Note:
Some of Moore Industries’ instruments can be
classified as receivers (IPT
2
, IPX
2
, etc.) and some
can be classified as transmitters (TRX, TRY, etc.)
while some are both a receiver and a transmitter
(SPA
2
, HIM, etc). Hence, your shield ground
connections should be appropriate for the type
of signal line being shielded. The shield should
be grounded at the receiver and not at the signal
source.
CE Conformity
Installation of any Moore Industries’ products that carry
the CE marking must adhere to the guidelines in the
Recommended Ground Wiring Practices section in
order to meet the EN 61326 requirements set forth in
the applicable EMC directive.
Printing Saved Configurations
1. Click on the “File” button. This brings up an
Explorer-like window on the left area of the
screen.
2. Navigate to the save file you want to print and
click on it.
3. Click on the “Print” button.
Note:
Printing saved configurations must be done when
the Explorer-like file window is up.
Содержание TDY
Страница 32: ...TDY 32 Demand Moore Reliability...
Страница 33: ...TDY Demand Moore Reliability 33...