
11. While holding inseal, place melt wedge on dowel pin. Apply anti-seize
compound to two SHCSM4X20. Insert melt wedge and hand tighten (less
than 0.56 Nm or 5 in-lb) until head of screw bottoms. Repeat for opposite
cavity melt wedge.
12. Install load wedge between melt wedges. Ensure the M4 set screws
(SSETSM4X10DM) are retracted and will not contact the Melt-CUBE at
this stage. Apply anti-seize compound to SHCSM6X25 and hand tighten
to about 0.79 Nm (7 in-lb) torque to make sure all components are in
proper contact condition.
13. Loosen load wedge screw (SHCSM6X25) one full turn in counter
clockwise direction to assure no engagement. Repeat for all load wedges.
14. Once the system is assembled, melt wedge and load wedge screws must
be retightened at process temperature.
See “19.3.11 Melt-CUBE Design A: Retighten Wedge Screws (Hot
SHCSM4X20
SHCSM6X25
SSETSM4X10DM
Melt-CUBE Design A Assembly - continued
19-13
MELT-CUBE SYSTEMS
Hot Runner User Manual
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
Содержание Hot Runner
Страница 1: ...Hot Runner User Manual Hot Runner User Manual version 31 Original Instructions...
Страница 2: ......
Страница 95: ......
Страница 318: ......