
12.
Torque fasteners to specifications detailed in General Assembly drawings.
13.
Turn assembled unit over and attach actuator connection hose fittings
to the supply ports. Tighten to specifications detailed in the General
Assembly drawing.
14.
Attach gate seal and liner to nozzle. Tighten to specifications detailed in
the General Assembly drawings. Attach nozzle thermocouple.
15.
Attach valve bushing. Tighten to specifications detailed in the General
Assembly drawing.
Accu-Line™
with Valve Bushing Assembly - continued
17-5
ACCU-LINE™
Hot Runner User Manual
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
Содержание Hot Runner
Страница 1: ...Hot Runner User Manual Hot Runner User Manual version 31 Original Instructions...
Страница 2: ......
Страница 95: ......
Страница 318: ......