
6. Install gate seal / liner into nozzle using 6 point socket provided. Torque
gate seal to 34-38 Nm (25-28 ft-lb) at process temperature.
15.7 Clean Nozzle Insulator Cap
1. Heat cap with heat gun.
2. Remove molten plastic and wipe remainder from insulator cap.
15.8 Installing Nozzle Insulator Cap
1.
Press fit insulator cap onto torpedo by hand.
Sprint Nozzle Tip Installation - continued
15-18
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
MAINTENANCE
Hot Runner User Manual
Содержание Hot Runner
Страница 1: ...Hot Runner User Manual Hot Runner User Manual version 31 Original Instructions...
Страница 2: ......
Страница 95: ......
Страница 318: ......