![Moeller LE 4-505-BS1 Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/moeller/le-4-505-bs1/le-4-505-bs1_hardware-and-engineering_1819277075.webp)
Construction and wiring of
the modules AM 1
and AM 2
73
02/98 AWB 27-1314-GB
Connecting the buttons and lamps to the AM 1
module
왘
Connect the buttons and lamps as follows:
Stop button – socket I-1
Start button – socket I-2
Lamp – socket 0-3
Figure 21: Connecting up the push-buttons and lamps
Connect the yellow and black ASi cables to the
module as described in “Connecting the ASi cable“
on page 70.
The yellow ASi cable provides data and power. The
black ASi cable provides the auxiliary energy for the
lamp.
21
22
+
1
4
1
4
1
4
13
14
+
1
4
1
4
1
4
+(24 V )
+(24 V )
User module
Sensors
Signal input
Signal input
INPUT I-1
Connector
Signal input
Signal input
INPUT I-2
Start
switch
Stop
switch
0 V
3
4
3
4
3
4
0 V
Switched output
User module
Actuator
Switched output
Output O-3
Connector
Lamp
H1314G.BK Seite 73 Freitag, 2. Juli 1999 9:02 09
Содержание LE 4-505-BS1
Страница 6: ...4 02 98 AWB 27 1314 GB H1314G BK Seite 4 Freitag 2 Juli 1999 9 02 09...
Страница 12: ...10 02 98 AWB 27 1314 GB H1314G BK Seite 10 Freitag 2 Juli 1999 9 02 09...
Страница 20: ...18 02 98 AWB 27 1314 GB H1314G BK Seite 18 Freitag 2 Juli 1999 9 02 09...
Страница 24: ...22 02 98 AWB 27 1314 GB H1314G BK Seite 22 Freitag 2 Juli 1999 9 02 09...
Страница 32: ...30 02 98 AWB 27 1314 GB H1314G BK Seite 30 Freitag 2 Juli 1999 9 02 09...
Страница 34: ...32 02 98 AWB 27 1314 GB H1314G BK Seite 32 Freitag 2 Juli 1999 9 02 09...
Страница 52: ...50 02 98 AWB 27 1314 GB H1314G BK Seite 50 Freitag 2 Juli 1999 9 02 09...
Страница 58: ...56 02 98 AWB 27 1314 GB H1314G BK Seite 56 Freitag 2 Juli 1999 9 02 09...
Страница 68: ...66 02 98 AWB 27 1314 GB H1314G BK Seite 66 Freitag 2 Juli 1999 9 02 09...