Example Application
The following example application shows how to
configure and program ASi devices. The example
configuration is chosen to highlight the AS Interface
and ASi devices.
Objectives
It is required to transfer a product P on a conveyor
belt B. The position of the product on the conveyor
belt is determined with four proximity switches (B1 -
B4). The start and stop buttons on the operating
panel are used to control the conveyor belt motor.
The on/off lamp shows whether the conveyor belt
motor is supplied with power.
Figure 16: Conveyor belt example (overview)
LE 4-
505-BS1
PS 4-201-
MM1
P
M
K1
0
I
220 V~
30 V
220 V~
24 V
F
Control cabinet
Start Stop
Operator unit
On/Off
ASi two-core cable for aux. power (black)
ASi two-core flat cable for data and power (yellow)
AM1
NG1
NG2
AM2
B1
B2
B3
B4
H1314G.BK Seite 67 Freitag, 2. Juli 1999 9:02 09
Содержание LE 4-505-BS1
Страница 6: ...4 02 98 AWB 27 1314 GB H1314G BK Seite 4 Freitag 2 Juli 1999 9 02 09...
Страница 12: ...10 02 98 AWB 27 1314 GB H1314G BK Seite 10 Freitag 2 Juli 1999 9 02 09...
Страница 20: ...18 02 98 AWB 27 1314 GB H1314G BK Seite 18 Freitag 2 Juli 1999 9 02 09...
Страница 24: ...22 02 98 AWB 27 1314 GB H1314G BK Seite 22 Freitag 2 Juli 1999 9 02 09...
Страница 32: ...30 02 98 AWB 27 1314 GB H1314G BK Seite 30 Freitag 2 Juli 1999 9 02 09...
Страница 34: ...32 02 98 AWB 27 1314 GB H1314G BK Seite 32 Freitag 2 Juli 1999 9 02 09...
Страница 52: ...50 02 98 AWB 27 1314 GB H1314G BK Seite 50 Freitag 2 Juli 1999 9 02 09...
Страница 58: ...56 02 98 AWB 27 1314 GB H1314G BK Seite 56 Freitag 2 Juli 1999 9 02 09...
Страница 68: ...66 02 98 AWB 27 1314 GB H1314G BK Seite 66 Freitag 2 Juli 1999 9 02 09...