![Moeller LE 4-505-BS1 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/moeller/le-4-505-bs1/le-4-505-bs1_hardware-and-engineering_1819277023.webp)
Installing in a control
cabinet
21
02/98 AWB 27-1314-GB
Installing in a control
cabinet
Please observe the following:
왘
Mount the PS 4-201-MM1 and the LE’s
horizontally in the control cabinet.
왘
Maintain a spacing of at least 50 mm (approx. 2”)
from the cable loom or duct.
왘
Keep the power section
햳
spaced apart from the
control equipment
햴
.
Figure 5: Device installed horizontally in a control cabinet
햲
Minimum spacing 50 mm (approx. 2”)
햲
Power section
햲
Cable duct
See also “Arrangement of equipment within the
control cabinet” on page 28.
햲
햴
50
햳
H1314G.BK Seite 21 Freitag, 2. Juli 1999 9:02 09
Содержание LE 4-505-BS1
Страница 6: ...4 02 98 AWB 27 1314 GB H1314G BK Seite 4 Freitag 2 Juli 1999 9 02 09...
Страница 12: ...10 02 98 AWB 27 1314 GB H1314G BK Seite 10 Freitag 2 Juli 1999 9 02 09...
Страница 20: ...18 02 98 AWB 27 1314 GB H1314G BK Seite 18 Freitag 2 Juli 1999 9 02 09...
Страница 24: ...22 02 98 AWB 27 1314 GB H1314G BK Seite 22 Freitag 2 Juli 1999 9 02 09...
Страница 32: ...30 02 98 AWB 27 1314 GB H1314G BK Seite 30 Freitag 2 Juli 1999 9 02 09...
Страница 34: ...32 02 98 AWB 27 1314 GB H1314G BK Seite 32 Freitag 2 Juli 1999 9 02 09...
Страница 52: ...50 02 98 AWB 27 1314 GB H1314G BK Seite 50 Freitag 2 Juli 1999 9 02 09...
Страница 58: ...56 02 98 AWB 27 1314 GB H1314G BK Seite 56 Freitag 2 Juli 1999 9 02 09...
Страница 68: ...66 02 98 AWB 27 1314 GB H1314G BK Seite 66 Freitag 2 Juli 1999 9 02 09...