45
MCP15-500.9
DIMENSIONS - C-CABINET SIZE UNIT BASE / ROOF CURB
21.50
59.22
106.22
2.53
2.00" DIA.
ELECTRICAL
ENTRY HOLE
9.24
22.38
36.75
50.00
21.00
50.00
BASE ASSEMBLY AS
VIEWED FROM BOTTOM
LOOKING UP
RETURN/
EXHAUST AIR
OPENING
(if applicable)
4.61
4.61
4.61
4.61
SUPPLY AIR
OPENING
2.53
1.37
4.09
INSIDE BASE ASSEMBLY
DETAIL VIEW
LANDING AREA
FOR ROOF CURB
11.93
2.53
CONDENSING
SECTION SIDE
UNIT ACCESS
SIDE
1.25" DIA. FURNACE
CONDENSATE DRAIN
LINE HOLES
(UNITS WITH
CONDENSING
FURNACES ONLY)
6.60
9.24
17.09
11.93
SEE DETAIL "A"
FOR DIMENSIONS
FOR UNITS WITH
HOT WATER HEAT
HOT WATER
PIPING ENTRANCE
(UNITS WITH HOT
WATER HEAT ONLY)
HOT WATER
PIPING EXIT
(UNITS WITH HOT
WATER HEAT ONLY)
DETAIL "A" FOR
UNITS WITH HOT
WATER HEAT
2.53
111.28
13.77
6.60
Figure 45.1 - Unit Base Dimensions (inches)
Figure 45.2 - Roof Curb Dimensions (inches)
SUPPLY AIR
OPENING
LOCATION
RETURN/
EXHAUST AIR
OPENING
LOCATION
(if applicable)
1.12
14.0 OR 24.0
SEE SCHEDULE
104.75
21.50
36.75
21.00
19.90
101.25
INSIDE
50.00
54.25
INSIDE
1.75
1.75
2.12
2.13
2.13
2.12
57.75
1.75
1.75
Table 45.3 - Roof Curb Weight (approx) - lbs.
Section
Description
Weight
Roof Curb
14” - Insulated
210
14” - Uninsulated
205
24” - Insulated
318
24” - Uninsulated
310
CURB ASSEMBLY AS
VIEWED FROM TOP
Содержание MPR Series
Страница 17: ...17 MCP15 500 9 PAGE INTENTIONALLY LEFT BLANK ...
Страница 67: ...67 MCP15 500 9 PAGE INTENTIONALLY LEFT BLANK ...