31
MCP15-500.9
START-UP PROCEDURE - CONTINUED
Stacked Primary/Secondary Furnaces
j
Stacked Secondary Furnaces (Opposite
Side
of
Cabinet)
j
Figure 31.1 - Gas Heat Option Gas Controls - D-Cabinet Units - 850,000 Btu/hr and Larger (Hybrid 87% Eff)
Secondary Furnace “B”
k
Primary Furnace
k
Secondary Furnace “A”
k
Secondary Furnace “C”
k
j
Refer to Figure 25.3 for location of furnace positions.
k
For identification of furnace components, refer to Figure
28.1 for the 81% efficient modules on the bottom and
Figure 30.1 for the condensing modules on the top.
j
Refer to Figure 25.3 for location of furnace positions.
k
For identification of furnace components, refer to Figure
28.1 for the 81% efficient modules on the bottom and
Figure 30.1 for the condensing modules on the top.
Содержание MPR Series
Страница 17: ...17 MCP15 500 9 PAGE INTENTIONALLY LEFT BLANK ...
Страница 67: ...67 MCP15 500 9 PAGE INTENTIONALLY LEFT BLANK ...