TABLE OF CONTENTS
1
INTRODUCTION
1
1.1
Purpose and Limitations ......................... 1
1.2
Standard Specifications ......................... 1
1.3
Conventions ......................................... 1
2
SAFETY and some USCG REQUIREMENTS
2
2.1
Binder Manuals ..................................... 2
2.2
Standard Equipment .............................. 2
2.3
Commissioning Package Safety Items ..... 3
2.4
USCG required equipment ..................... 3
2.5
Additional Safety Equipment ................... 3
2.6
Some Additional USCG Requirements .... 3
2.7
Fuel Shut-off Valves .............................. 4
2.8
Fire Suppression ................................... 4
2.9
Notices ................................................ 4
2.10
Emergency and Thru Hull Diagram .......... 5
3
PROPULSION
6
3.1
Engines ................................................ 6
3.2
Daily Engine Check ............................... 6
3.3
Starting the Engines .............................. 8
3.4
Stopping the Engines ............................ 9
3.5
New Engine Break-in ............................. 9
3.6
Auxiliary Stop ........................................ 9
3.7
Operating Parameters ............................ 9
3.8
Leaving the Boat ................................. 10
3.9
Volvo Penta D6 IPS Engines ................. 11
4
INSTRUMENTS AND CONTROLS
12
4.1
Helm Station ....................................... 12
4.2
Engine/Shift Control Levers .................. 12
4.3
Joystick .............................................. 13
4.4
Electronics ......................................... 14
4.5
Compass Heading and Calibration ........ 15
4.6
Trim Tabs ........................................... 15
4.7
Searchlight ......................................... 15
4.8
Autopilot ............................................. 16
4.9
Single Engine Steering ......................... 16
4.10
MultiFunction Dislay (MFD) ................... 16
4.11
Console Switch Panel ......................... 16
4.12
Windshield Operation .......................... 17
5
ELECTRICAL SYSTEMS
18
5.1
Electrical Safety ................................. 18
5.2
Electrical Power .................................. 18
5.3
Shore Power ....................................... 19
5.4
Fuse Locatons .................................... 19
5.5
24-Hour Circuits ................................. 19
5.6
The 12V DC Panel ............................... 20
5.7
The 120V AC Panel ............................. 21
5.8
Northern Lights Generator (O p t i o n ) ..... 22
5.9
Corrosion Protection ............................ 23
5.10
Generator Component Locations .......... 24
5.11
Victron Inverter/Charger ....................... 25
5.12
Bonding ............................................. 25
6
WATER SYSTEMS
26
6.1
Fresh Water ........................................ 26
6.2
Hot Water ........................................... 26
6.3
Gray Water ......................................... 27
6.4
Raw Water .......................................... 28
7
SEAKEEPER GYROSTABILIZER (Option)
29
7.1
To Start the Gyro ................................ 29
7.2
Activate/De-activate ............................ 29
8
EQUIPMENT, APPLIANCES and FINISHES
30
8.1
Anchor Windlass ................................. 30
8.2
Anchor Washdown .............................. 30
8.3
Fusion Multi-media Player .................... 30
8.4
Privacy/Sunscreen Curtains (Option) ..... 31
8.5
Transom Door and Seat (Option) .......... 31
8.6
Vacuum Cleaner ................................. 31
8.7
Cooktop ............................................. 32
8.8
Microwave .......................................... 32
8.9
Refrigerator ......................................... 32
8.10
Freezer .............................................. 32
8.11
TVs (optional) ...................................... 32
8.12
Vacuum Flush Head System ................ 33
8.13
Air Conditioning (Optional) ................... 33
8.14
Finishes ............................................. 34
9
APPENDIX
35
9.1
The Top 10 Causes of Engine Failure .... 35
9.2
Diesel Operation ................................. 36
9.3
Starting with Low Batteries ................... 38
9.4
Winter Storage .................................... 39
9.5
Spring Commissioning ......................... 40
9.6
Hauling Out and Blocking ..................... 40
9.7
Trailer Loading Checklist ...................... 40
9.8
Fuel Consumption ............................... 41
9.9
Routine Maintenance ........................... 42
9.10
Boat Lift and Bunk Offsets ................... 43
9.11
Systems Location Plan ........................ 44
9.12
Systems Key ...................................... 45
9.13
Wiring Diagrams ................................. 46
9.14
Fuse Locations & Specifications ........... 47
9.15
Fuel Consumption Log. ....................... 48
9.16
Boston Boatworks Limited Warranty ..... 49
10
THE MJM TEAM
53
10.1
Bob Johnstone ................................... 53
10.2
Chris Hughes ..................................... 53
10.3
Doug Zurn .......................................... 53
10.4
Scott Smith ........................................ 54
10.5
Mark Lindsay ..................................... 54
10.6
Steve Burke ....................................... 54
Содержание 40z
Страница 1: ...40z Owners Guide...
Страница 4: ......
Страница 52: ...Chapter 12 Appendix MJM 40z Owner s Guide page 44 9 11 SYSTEMS LOCATION PLAN...
Страница 63: ......
Страница 64: ......