background image

Chapter 5, Electrical Systems, MJM 40z Owner’s Guide                                        page 19 

5.3

 

S

HORE 

P

OWER

 

There are two ways to provide shore power. 

A single 30A 125V shore power cable

 plugged in to 

SHORE POWER INLET 

1

 in the transom (shown in the adjacent photograph) will provide power to 

breakers at the left side of the 120V 

AC panel

Two 30A 125V shore power cables

 connected to 30A 125V volt sockets 

at the dock

 and plugged into SHORE POWER INLET 1 AND SHORE POWER 

INLET 2 will provide power to breakers on both sides of the 

120V 

AC panel

. The 

transfer switch should be off. Even if it is on, 120V AC won’t be transferred 
to the left panel from the right panel. 

Instead of two 30A 125V volt sockets at the dock, there may be a single 
50A 225V socket. In that case, use a Y adapter that splits the power for 
two 30A 125V shore power cables. (See adjacent image.) 

Charging 

The batteries will accept a charge from 120V shore power 

through the 

INVERTER/CHARGER if SHORE POWER 1 is on

 even if the 

HOUSE BATTERY 

switch is 

off

Transfer Switch

 If 

SHORE POWER 2 

isn’t connected, the 

TRANSFER 

SWITCH

 transfers power from the left side of the 

120V AC BREAKER panel 

to 

the right side. However, the circuits on the right side are for high amp 
loads. If you use the 

TRANSFER SWITCH

 with 

SHORE POWER 1

 alone, the 

circuits that can be successfully powered are limited. Operating the 

AIR 

CONDITIONING

, the 

COOKTOP

 and the 

WATER HEATER

 together would 

overload the circuit.  

If you overload the shore power circuit and trip the breaker you may reset it 
by pushing the switches on the 

SHORE POWER BREAKER BOX. It’s

 

outboard under the port cockpit hatch cover. (See sidebar.) 

If you plan to use more than one of the 

AIR CONDITIONING 

systems at the 

same time,

 it would be best to supply 

the circuits on the right side of the 

panel with the 

GENERATOR

 or 

SHORE POWER

 2 that bypasses the 

INVERTER/CHARGER

. The left side 120V AC circuits may also be supplied 

from the 

HOUSE BATTERIES 

with the 

INVERTER/CHARGER

. (See page 25.)  

5.4

 

F

USE 

L

OCATONS

 

(See the Appendix, Page 46.) 

5.5

 

24-H

OUR 

C

IRCUITS 

 

The connection block for the 24-hour circuits is forward in the starboard 
pilothouse settee locker.

 

The 24-hour circuits (shown in the sidebar) 

bypass the breaker panel, 

HOUSE, ENGINE and GENERATOR

 

switches

 and 

are connected directly to the 

HOUSE BATTERY

.

 

They are: 

 

BILGE PUMPS (3 connections) 

 

HIGH WATER ALARM 

 

EMERGENCY PARALLEL

 

 

STEREO MEMORY 

 

The 

EMERGENCY PARALLEL

 connection enables the EMERGENCY 

PARALLEL switch on the 12V DC panel. The 

STEREO MEMORY connection 

provides a trickle charge to maintain the clocks and user settings.

 

 Disconnecting shore power with 

INVERTER

 left 

on

 

will 

discharge the 

HOUSE BATTERIES over time

. (See page 25.)

 

SHORE POWER INLET 1

 is 

connected. None at 

SHORE POWER 

INLET 2

. The receptacle on right is for 

Ethernet and coax TV connections. 

 

 

 

SHORE POWER BREAKER BOX 
 

 

A Y adapter can split 50A 220V shore 
power to two 30A 125V shore power 
cables. 

 

24-HOUR CIRCUITS connection 
terminal 

Содержание 40z

Страница 1: ...40z Owners Guide...

Страница 2: ...t in boats Simply messing nothing seems really to matter That s the charm of it Whether you get away or whether you don t whether you arrive at your destination or whether you reach somewhere else or...

Страница 3: ...e they re beautiful Primary to this Owners Guide and in terms of authority are two large binders with equipment supplier owner manuals and warranties These documents contain an enormous amount of impo...

Страница 4: ......

Страница 5: ...n ENGINE BATTERY switches at the top of the 120V AC panel At the helm push the IGNITION BUTTON for each engine it lights up Wait until the Volvo Penta ENGINE CONTROL DISPLAY shows gauges start ENGINES...

Страница 6: ...ve 4 m calculations are based on 7 m and wind speeds in excess of Beaufort Force 8 but excluding abnormal conditions e g hurricanes CAPACITY PERSONS Maximum 16 Persons PERSONS GEAR Maximum Load 3518 k...

Страница 7: ...e 120V AC Panel 21 5 8 Northern Lights Generator Option 22 5 9 Corrosion Protection 23 5 10 Generator Component Locations 24 5 11 Victron Inverter Charger 25 5 12 Bonding 25 6 WATER SYSTEMS 26 6 1 Fre...

Страница 8: ...imum width on trailer 12 0 ft Maximum Trailer weight 21 800 lbs Draft with IPS pod drives 3 3 ft Displacement load 18 900 lbs Fuel tankage two 175 gallon tanks 350 gal Fresh water tankage including ho...

Страница 9: ...n t qualify you to work on them When they need attention please use qualified mechanics If you question the information or are unsure about an action check with the equipment supplier a qualified pers...

Страница 10: ...ification System AIS will report your MMSI number to other vessels and you will see their MMSI number If you sell your boat the MMSI number is normally transferred with it but the new owner should upd...

Страница 11: ...eacon alerts search and rescue services by transmitting a coded message and is detectable by satellite anywhere in the world Although the USCG doesn t require them EPIRBs are essential offshore and de...

Страница 12: ...Don t allow debris or oily rags to collect anywhere Check bilges for oil or diesel fuel regularly Shut down unnecessary circuits when leaving the boat Don t leave heat producing appliances or equipme...

Страница 13: ...ore Power Breakers Seakeeper Thru Hull Deck Drain Thru Hull Waste Discharge Thru Hull Engine Room SeaFire Electric Bilge Pump 1 Bilge 1 Thru Hull AC Thru Hull AC Raw Water Intake Systems Room SeaFire...

Страница 14: ...AKER PANEL settings ENGINE HATCH breaker on Move the side deck chairs out of the way and ensure the cockpit door latch is clear before raising the hatch Activate COCKPIT ENGINE HATCH lift with black t...

Страница 15: ...NGINE RAW WATER STRAINER In a cool engine it should be about 1 below the top Consult the Volvo Penta Operator s Manual VPOM for the proper coolant Don t remove the coolant cap from a hot engine Don t...

Страница 16: ...anel At the helm a red light flashes under the O symbol on the e KEY PANEL Hold the key fob in front of the O symbol to unlock the Electronic Vessel Control EVC system A sound confirms the system is u...

Страница 17: ...ne has an engine oil drain hose 3 6 AUXILIARY STOP If the engine doesn t stop normally there s an AUXILIARY STOP at the side of the engine Just push the button See adjacent diagram and refer to Auxili...

Страница 18: ...t is left in the water unused for an extended period the engine must be warmed up at least once every two weeks to prevent corrosion damage in the engine If you expect the boat to be unused for two mo...

Страница 19: ...6 Engine control unit 7 Alternators 8 Compressor 9 Water shut off valve propulsion unit 10 Oil filter propulsion unit 11 Expansion tank 12 Seawater filter 13 Fuel filter 14 Aux stop 15 Oil bypass filt...

Страница 20: ...nd gear selection When shifting allow the transmission to engage the new gear before throttling up Engine and drive features are controlled with push buttons on the ENGINE SHIFT CONTROL Button functio...

Страница 21: ...or pulled back It s prudent to warn guests when you change speed 4 3 JOYSTICK To Activate Both engines must be running with the ENGINE SHIFT CONTROL LEVERS in NEUTRAL Choose one of the functions below...

Страница 22: ...o out and the system will return to docking Refer to Joystick for docking page 41 of the VPOM The ENGINE CONTROL DISPLAY panel allows the operator to perform settings and choose information to be disp...

Страница 23: ...They are useful in lowering the bow for better visibility or for powering into waves without pounding Don t hesitate to apply maximum tabs in the 15 22 knot range At higher speeds in smooth water when...

Страница 24: ...use the ENGINE SHIFT CONTROL LEVERS to steer the boat 4 10 MULTIFUNCTION DISLAY MFD BREAKER PANEL settings Turn INSTRUMENTS breaker on The primary purpose of the MULTI FUNCTION DISPLAY MFD is to show...

Страница 25: ...e NAV ANC Press the forward end of rocker switch to turn on the RED and GREEN NAVIGATION LIGHTS and the STEAMING LIGHT on the hard top over the pilothouse Press the aft end of rocker switch to turn on...

Страница 26: ...r than keeping them charged stored and clean especially between the terminals there s no maintenance required Don t let the voltage fall below 12 volts Sensitive electronics may fail to function 120 V...

Страница 27: ...P and the WATER HEATER together would overload the circuit If you overload the shore power circuit and trip the breaker you may reset it by pushing the switches on the SHORE POWER BREAKER BOX It s out...

Страница 28: ...the Volvo ENGINE CONTROL DISPLAY Press the and buttons under the display to show volts or amps The center button dims the display The switch between the HOUSE BATTERY and the GEN BATTERY raises and lo...

Страница 29: ...entation on the digital display The TOGGLE switch selects which side of the panel is reported in the digital display Information from the left side of the panel is displayed in the up position and inf...

Страница 30: ...both SLIDING INTERLOCKS up on the 120V AC panel and turn on the GENERATOR breaker at the left side of the 120V AC panel to connect the left side of the panel to generator power Turn on the TRANSFER S...

Страница 31: ...articles are in suspension and not lying in bottom 5 9 CORROSION PROTECTION In addition to transom anodes there are two engine anodes plus an iron anode in the exhaust cavity of the drive Inspect the...

Страница 32: ...il Fill Top 5 Wet Exhaust Elbow 6 Generator Junction Box 7 Control Panel Plug In 8 Generator End Cover 9 Vibration Mount 10 Starter Motor 11 DC Regulator 12 DC Alternator 13 Belt Guard 14 AVR Circuit...

Страница 33: ...l be supplied to the left side of the AC 120V panel When the INVERTER is on the TRANSFER SWITCH does not provide power to circuits on the right side of the 120V AC BREAKER panel Although INVERTER CHAR...

Страница 34: ...drops below the minimum the pressure switches turn the pumps on and build pressure to the maximum The pumps have outlet check valves that maintain pressure when pumps are off The pump is protected fr...

Страница 35: ...any taste in the water or at least annually The filter is rated for 1000 gallons equal to about 15 water tanks The replacement cartridge is Seagull IV X 1 Residential Replacement Cartridge RS 1SG and...

Страница 36: ...here is water in the bilge or not The switches are wired so that the off position functions the same as the AUTO position The emergency MANUAL BILGE PUMP delivered under the port pilot seat Is a backu...

Страница 37: ...image at top If a FAULT is present an ALARM screen will appear Press the POWER ON OFF button once The RED PROGRESS BAR turns green and the GYRO begins spinning It takes about 40 minutes before the GYR...

Страница 38: ...hafe on the anchor rode and to avoid damaging the windlass gears When underway or when leaving the boat secure the anchor and chain with the retainer clamp This prevents the anchor and rode from runni...

Страница 39: ...ANEL settings VACUUM breaker on Dirt Devil states that the HEPA filter bags capture particles that cover common allergens from mold and animal dander to dust mites and pollen along with some small par...

Страница 40: ...cking with food and beverages 8 10 FREEZER BREAKER PANEL settings FREEZER breaker on The FREEZER in the galley requires 12V DC The built in freezer box has stainless steel inner lining plastic bottom...

Страница 41: ...mp system and press the SERVICE BUTTON to remove the vacuum 2 Discharged overboard with the DISCHARGE PUMP Open the large through hull discharge waste valve accessible under the cockpit hatch aft and...

Страница 42: ...oblem The cabin deck and cabinetwork are finished in clear Awlgrip See the Awlgrip website for care and maintenance advice http www awlgrip com Corian Instructions for maintaining Corian counter tops...

Страница 43: ...separator protects against this by handily extracting the water Check the bowl daily and drain off the accumulated water For severe contamination use a fuel drying additive or have a diesel service p...

Страница 44: ...ull speed Batteries may not fully charge and coolant circulates sluggishly The solution is to check belt tension regularly and tighten belts when necessary Drive belts can also snap The only way to av...

Страница 45: ...ire due to abrasion of insulation around wire or chafing through the wall of a hose From time to time inspect your engine compartment for these potential risks Add chafing protection replace worn insu...

Страница 46: ...ngine has a dedicated ENGINE BATTERY They may be connected with the ENGINE EMERGENCY PARALLEL EEP switch Normally the EEP switch should be off Each ENGINE ALTERNATOR provides 12V DC current to charge...

Страница 47: ...d when adequate use the ENGINE EMERGENCY PARALLEL switch to start the STARBORD ENGINE following the procedure similar to the above paragraph Starting Engines With One Low Engine Battery However you wi...

Страница 48: ...k for leaks Paint Apply anti fouling paint to the IPS drives the props and the bottom if needed 9 6 HAULING OUT AND BLOCKING Refer to the illustration titled Boat Lift Bunk Offsets in the Appendix pag...

Страница 49: ...gests that in suitable conditions 10 below open throttle about 3200 RPM at 30 knots is optimum cruising speed The data below would indicate that 2900 3000 RPM at 28 knots would be more efficient Sour...

Страница 50: ...ination and clean Fuel filter Ea 100 HRS Check drain and replace filter ea 100 hrs Engine hoses Weekly Tighten and secure if necessary Exhaust system Weekly Inspect for leaks Check anti siphon RAW WAT...

Страница 51: ...age 43 9 10 BOAT LIFT AND BUNK OFFSETS A boat bunk the shaded gray area tine drawing below is a support shaped in three dimensions to fit and support the boat The length and cross section dimensions t...

Страница 52: ...Chapter 12 Appendix MJM 40z Owner s Guide page 44 9 11 SYSTEMS LOCATION PLAN...

Страница 53: ...page 45 9 12 SYSTEMS KEY The System Location Plan above and the System Key are the baseline configuration for the MJM40z There are modifications due to continuous improvement and individual customiza...

Страница 54: ...ER 2 120V AC Electrical Diagram 40z Boston BoatWorks LLC PORT ENGINE STBD START BATTERY STARBOARD ENGINE PORT START BATTERY PORT ENGINE REMOTE SWITCH GENSET REMOTE SWITCH STBD ENGINE REMOTE SWITCH GEN...

Страница 55: ...r 1 Negative 15 ATC Battery combiner next to AIR CONDITIONER control bridge deck hatch Battery combiner next to AIR ConDITIonER control bridge deck hatccchaadfaasfsaaf 19 Combiner 2 Negative 15 ATC Ba...

Страница 56: ...Chapter 12 Appendix MJM 40z Owner s Guide page 48 9 15 FUEL CONSUMPTION LOG Date Location Engine Hours Hours Since Last Fill Gals To Fill GPH Comment...

Страница 57: ...period often 10 years from delivery date by an Authorized Dealer This warranty may be transferred to your buyer on the same manner as the Basic Warranty E Dealers The name and address of Authorized D...

Страница 58: ...Registration Card for the Vessel Cards should be sent to Boston BoatWorks LLC 333 Terminal Street Charlestown MA 02129 ATTN Customer Service L The information contained on this card will enable the Ma...

Страница 59: ...rst name Last name ___________________________________________ ______________________________________________ First name Last name ___________________________________ _________________________________...

Страница 60: ...e Hull Dealer service Boat Owner Address Address Address continued Address Continued Phone email Phone Number e mail Fax Boat Location Contact person Delivery Date Description of Defect please attach...

Страница 61: ...ery conceivable version of recreational vessel waverunners sailfish small and large inboards racing dinghies power and sailing cruisers center console fishing boats offshore sport fishers and luxury y...

Страница 62: ...won a Sunfish championship He studied architecture at the U of Penn and MIT and began his boat building career One of the first to realize the strength to weight characteristic of vacuum bagged epoxy...

Страница 63: ......

Страница 64: ......

Отзывы: