Connection to PLC by Sharp 11
11-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
11.
Connection to PLC by Sharp
11.1
System configuration
*1 The connection cable is to be prepared by the user.
For the details of the cable preparation method, refer to section 11.4.
*2 For communication with the GOT, the communication setting is required.
For the details of the contents of setting, refer to section 11.2.
GOT
Handy GOT
PLC by Sharp
JW-22CU,JW-70CUH,
JW-100CUH
PLC by Sharp
JW-32CUH,JW-33CUH
*2
*2
*1
F9GT-HCAB-
M/
F9GT-HCAB1-
M
For untied
cable
External cable dedicated to
handy GOT
A953 HANDY GOT
Содержание A953GOT-LBD-M3-H
Страница 1: ...HARDWARE MANUAL A953 HANDY GOT TARGET MODELS FOR RS 232C CONNECTION A953GOT LBD M3 H A953GOT SBD M3 H ...
Страница 4: ...A953 HANDY GOT ii ...
Страница 6: ...A953 HANDY GOT iv ...
Страница 14: ...A953 HANDY GOT xii MEMO ...
Страница 28: ...A953 HANDY GOT Introduction 1 1 8 MEMO ...
Страница 42: ...A953 HANDY GOT Installation Wiring 2 2 14 MEMO ...
Страница 58: ...A953 HANDY GOT Wiring and Handling of Switches 3 3 16 MEMO ...
Страница 72: ...A953 HANDY GOT Specifications 4 4 14 MEMO ...
Страница 80: ...A953 HANDY GOT CPU Direct Connection 6 6 6 MEMO ...
Страница 98: ...A953 HANDY GOT Connection to PLC by Omron 8 8 10 MEMO ...
Страница 104: ...A953 HANDY GOT Connection to PLC by Yaskawa Electric 9 9 6 MEMO ...
Страница 108: ...A953 HANDY GOT Connection to PLC by Allen Bradley 10 10 4 MEMO ...
Страница 130: ...A953 HANDY GOT Connection to PLC by Siemens 13 13 4 MEMO ...
Страница 134: ...A953 HANDY GOT Diagnostics 14 14 4 MEMO ...
Страница 141: ......