- 91 -
[
VII
Control ]
-7- Switching Between Pulse and Level of MA Remote Controller External Input
The start/stop operation can be performed by either of the MA remote controller or the external input (pulse/level).
Input
DIPSW on the address circuit board (No.1 and No. 2)
Function
Start/Stop
Usage
Sending ON/OFF
command to the
indoor unit
Signal specifications
Pulse (With-voltage/No-voltage a-contact) *
<In case of with-voltage>
Power supply:12~24V DC Electrical current:10mA (12V DC)
(Pulse powering time) (Pulse interval)
<Pulse specification>
over 200ms
Valid operation
External input (level)
External input (pulse)
MA remote controller
SW1-10 = ON
SW1-10 = OFF
SW1-9 = OFF
SW1-9 = ON
* For the MA remote controller and the external input, the operation command sent later has no priority.
* The manipulator for centralized control can be operated regardless of the SW1-9 status (ON),
and SW1-10 status (OFF).
* When the Normal/Inspection switch on the main unit is set to "Inspection", the external input will be disabled.
Only the operation performed by the MA remote controller is valid.
* Use a contact point for small electrical current (12V DC 1mA).
-8- Operation during Electrical Power Failure
After the controller in this air conditioning unit receives signals indicating power failure or an instantaneous
drop in voltage, unless the unit receives a command not to restart, it will resume its operation after power
supply is restored.
Depending on the duration of power outage, the following operations will be run.
Note 1: When indoor unit is in the maintenance mode , it will not resume operation even after the power has
been restored.
Note 2: After the unit resumes its operation, MA remote controller will display ’HO’ for fifteen seconds,
during
which time the MA remote controller will not respond. To turn off the unit during this time, turn off the
power with an electric leak breaker.
Duration of Power Outage
Unit Operation
Shorter than 6msec
Both indoor and outdoor units will stay on.
Longer than 6msec and
Shorter than 50msec
(Note1, Note2)
It is recognized by the unit as aninstantaneous power outage
Indoor Unit: The fan stays on.
Outdoor Unit: Compressor stops, then resumes its operation 20 seconds later.
Longer than 50msec
(Note1, Note2)
It is recognized by the unit as power outage.
Air-conditioning unit will stop (incl. fan and compressor).
It will resume operation after the power has been restored.
* The unit operation is resumed after 20 seconds plus "half of the indoor unit address"
seconds (40 seconds at maximum) have passed since the power has been restored.
over 200ms
External input-output
board (IFB)
The case of with-voltage input ... A
The case of no-voltage input .... B
When using the external input function on the indoor unit
that is connected to a two-refrigerant circuit, connect the
short-circuit plate that is supplied with the unit to the
appropriate terminals on the external input-output board.
AC
A1
A2
BC
B1
B2
A
B
TB23
TB21
Содержание PU(H)Y-P250YGM-A
Страница 1: ...Models Service Handbook AIR CONDITIONERS PU H Y P250YGM A PUHY P500YGM A PFD P250VM E PFD P500VM E ...
Страница 9: ......
Страница 11: ... 2 ...
Страница 23: ... 14 ...
Страница 25: ... 16 ...
Страница 41: ... 32 ...
Страница 53: ... 44 ...
Страница 67: ... 58 ...
Страница 72: ... 63 VI Refrigerant Circuit 1 Refrigerant Circuit Diagram 65 2 Principal Parts and Functions 68 ...
Страница 73: ... 64 ...
Страница 81: ... 72 ...
Страница 83: ... 74 ...
Страница 105: ... 96 ...
Страница 107: ... 98 ...
Страница 117: ... 108 ...
Страница 119: ... 110 ...
Страница 182: ... 173 X LED Monitor Display on the Outdoor Unit Board 1 How to Read the LED on the Service Monitor 175 ...
Страница 183: ... 174 ...