![Mitsubishi Electric NZ2GF-CCB Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/mitsubishi-electric/nz2gf-ccb/nz2gf-ccb_user-manual_1811813065.webp)
63
CHAPTER 7 VARIOUS SETTINGS
7
7.
2 Par
a
met
e
r
S
e
ttings f
o
r CC-Link
11.
Click the [Execute] button and the following window is displayed.
12.
Click the [Yes] button.
13.
The parameters of the CC-Link remote station are written to the bridge module.
The parameter setting of the CC-Link remote station is completed.
14.
Power off and on or reset the power supply of the bridge module.
Содержание NZ2GF-CCB
Страница 1: ...CC Link IE Field Network CC Link Bridge Module User s Manual NZ2GF CCB ...
Страница 2: ......
Страница 9: ...7 Memo ...
Страница 35: ...33 CHAPTER 4 THE PROCEDURE BEFORE OPERATION 4 Memo ...
Страница 143: ...141 APPENDICES A Appendix 7 External Dimensions Appendix 7 External Dimensions 160 65 4 5 68 9 2 Unit mm ...
Страница 145: ...I 4 4 7 8 143 Memo ...
Страница 149: ......