![Mitsubishi Electric NZ2GF-CCB Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/mitsubishi-electric/nz2gf-ccb/nz2gf-ccb_user-manual_1811813034.webp)
32
CHAPTER 4
THE PROCEDURE BEFORE
OPERATION
This chapter describes the procedure before operation.
1.
Station number setting
Set the station numbers of the bridge module. (
Set the station numbers of the CC-Link remote station. (
Manual for the CC-Link remote station)
2.
Installation
Install the bridge module on a DIN rail. (
Page 41, Section 6.3)
3.
Wiring
Connect a power supply, Ethernet cable, and CC-Link dedicated cable to the bridge module. (
Page
44, Section 6.4)
Connect a power supply, CC-Link dedicated cable, and external device to the CC-Link remote station.
(
Manual for the CC-Link remote station)
4.
Parameter setting for CC-Link IE Field Network
Connect the master station to the engineering tool to set the parameters of CC-Link IE Field Network.
(
Page 53, Section 7.1)
5.
Parameter setting for CC-Link
Set the parameters of CC-Link with the switch of the bridge module or using the engineering tool. (
6.
Programming
Create a program. (
To change the system, follow the procedure described below.
• Power off the system.
• Delete or add the CC-Link remote station and perform the procedure above from "Station number setting" to
"Programming".
Содержание NZ2GF-CCB
Страница 1: ...CC Link IE Field Network CC Link Bridge Module User s Manual NZ2GF CCB ...
Страница 2: ......
Страница 9: ...7 Memo ...
Страница 35: ...33 CHAPTER 4 THE PROCEDURE BEFORE OPERATION 4 Memo ...
Страница 143: ...141 APPENDICES A Appendix 7 External Dimensions Appendix 7 External Dimensions 160 65 4 5 68 9 2 Unit mm ...
Страница 145: ...I 4 4 7 8 143 Memo ...
Страница 149: ......